17 Jan 2001, 16:46 UTC
Schedule going real time for 1/18
- From
- Donald Robinson donald.robinson@enron.com
- Date
- Wed, 17 Jan 2001 08:46:00 -0800 (PST)
PAC@CHOLLA-APS(T)CHOLLA/WW O#1198 F-PACW-APS(T)WW/MEAD5 O# 1197 F-PACW-AZPS(T)MEAD 500/ MEAD230 O#1210 F-PACE- EPMI-METRPOLWA-SCETAG<ISO(T)MEAD230/CISOSYS(EPMI_CA_010)<CISOSYS . 50mw LLH at Mead. See MISC_JAN_P sheet, line 57. This schedule is going real-time due to cuts that happened. Metropolitan Water called looking for a tag, but I told him Real-time doesn't need to do LLH tags yet. He is fine with that and knows that if there is a problem he will call our real time desk. Donald.