30 Nov 2001, 00:38 UTC
Start Date: 11/29/01; HourAhead hour: 15; <CODESITE>
- From
- Pete Davis pete.davis@enron.com
- To
- Pete Davis
- Cc
- Albert Meyers, Bill Williams III, Craig Dean, Eric Linder, Geir Solberg, John Anderson, Kate Symes, Leaf Harasin, Mark Guzman, Michael Mier, Pete Davis, Ryan Slinger
- Bcc
- Albert Meyers, Bill Williams III, Craig Dean, Eric Linder, Geir Solberg, John Anderson, Kate Symes, Leaf Harasin, Mark Guzman, Michael Mier, Pete Davis, Ryan Slinger
- Date
- Thu, 29 Nov 2001 16:38:41 -0800 (PST)
Start Date: 11/29/01; HourAhead hour: 15; No ancillary schedules awarded. Variances detected.
Variances detected in Energy Import/Export schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final Schedules\2001112915.txt
Error retrieving HourAhead price data - process continuing...
---- Energy Import/Export Schedule ----
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 15 / Preferred: 0.00 / Final: 0.01)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 11/29/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_A
ENGY_TYPE: WHEEL
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 15 / Preferred: 0.00 / Final: 0.01)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 11/29/01
TIE_POINT: FCORNR_5_PSUEDO
INTERCHG_ID: EPMI_CISO_B
ENGY_TYPE: WHEEL
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 15 / Preferred: 25.00 / Final: 24.97)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 11/29/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_EPE
ENGY_TYPE: NFRM
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 15 / Preferred: 522.56 / Final: 522.56)
TRANS_TYPE: FINAL
LOAD_ID: PGE3
MKT_TYPE: 2
TRANS_DATE: 11/29/01
SC_ID: EPMI