Gerald: Slight change. Mark doesn't want this to be an affidavit, per se. This doesn't need to be a sworn, deposition-like document. He wants a signed letter/statement covering the following four points (in numbered bullets or otherwise): 1. On 29 September, 2000, 3 units at the Bammel Site were scheduled to be running during the Baseline Period. 2. These units were NOT running during the Baseline Period due to an unanticipated filming session for HPL,s 75th Anniversary celebration. 3. The units were left off during the Curtailment Period in an effort to help reduce Reliant,s demand load. 4. In order to make up for lost operations during the Curtailment Period, the units were run after the Curtailment was finished. Also, who needs to sign this? Mark thinks it would probably be OK for him to do it. Sorry for the confusion. Call me w/questions. ~John