1 May 2001, 16:37 UTC
LM6000 24 pack Storage Letter- copy please.
- From
- John G Rigby john.rigby@enron.com
- To
- Kay Mann, Ben Jacoby
- Date
- Tue, 1 May 2001 09:37:00 -0700 (PDT)
Ben and Kay Project is Eletrobolt. ESA has had GE send the stacks for the Electrobolt LM6000 back to Braden for modifications necessary for Eletrobolt and there are a couple other changes. I need to prepare an amendment cover those changes as well a capture the in and out costs related to the Eletrobolt units. Matt T told me that Ben signed out a letter prepared by Kay addressing an agreement related to storage of the units that was different from the 24 pack base contract. Matt says he does not have the letter. I would be very helpful if I could have a copy of the letter so I understand the changes so I do not upset the prior deal. Once I have the amendment prepared in addition to the Eletrobolt team review, I would like to bounce off Ben and Kay to ensure I have not harm to other aspects of the 24 pack purchase. Thanks