27 Nov 2001, 16:17 UTC
Capacity Subscription Strategy
- From
- Lindy Donoho lindy.donoho@enron.com
- Bcc
- Steven Harris
- Date
- Tue, 27 Nov 2001 08:17:58 -0800 (PST)
How does this look? Also, I did change some numbers in the excel spreadsheet: The Ignacio to Blanco subscription levels were pulling from the row excluding ROFR capacity in the supporting sheet. I changed it to be consistent with the other capacities (which include ROFR capacity). Shelley had made some assumptions about East of Thoreau capacity subscription, such as, the USGT 400,000/d contract would remain subscribed (it doesn't have ROFR) and she had included the extension of 2-3 other contracts that don't have ROFR. These contracts were then dropped after 2005. I continued the extensions through 2006. I changed the East of Thoreau capacity to 750,000/d from 850,000/d.