24 Aug 2000, 03:51 UTC
X16049.DOC
- From
- MBD mday@gmssr.com
- Date
- Wed, 23 Aug 2000 20:51:00 -0700 (PDT)
<<X16049.DOC>> Here are proposed amendments for the Ducheny siting bill, AB 970, which reflect the input of Sam When and Allan Thompson. In addition, I have reviewed the SCE/PG&E rate stabilization proposed legislation. This legislation extends a rate cap type rate stabilization plan until March 31, 2003. The language included a "flexible" rate cap so that the commission can increase rates to reflect variations in the cost of gas and electricity, etc. It has some language to ensure that the "customers which benefit from stabilized rates do not avoid costs associated with providing the stabilized rates". This would seemingly prevent cost shifting and retroactive ratemaking. The main thrust is to allow the utility to recover all non-CTC costs during this period. It specifically amends Section 368(a) to eliminate a provision which appears to require the utilities to absorb all costs (including CTC) not recovered by the end of the transition period. My main reaction is that this bill is not necessary. The SCE and PG&E caps are still in place and will be in place through most if not all of 2001. This bill is being offered now to increase its chances of passage in the "crisis mode" now prevalent. It should be deferred until the commission has proceeded farther with its investigation. Mike Day - X16049.DOC