5 Apr 2001, 08:42 UTC
Start Date: 4/5/01; HourAhead hour: 9; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, Holden Salisbury, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis
and 1 more
Ryan Slinger - Bcc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, Holden Salisbury, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis
and 1 more
Ryan Slinger - Date
- Thu, 5 Apr 2001 01:42:00 -0700 (PDT)
Start Date: 4/5/01; HourAhead hour: 9; No ancillary schedules awarded.
Variances detected.
Variances detected in Generation schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001040509.txt
---- Generation Schedule ----
$$$ Variance found in table tblGEN_SCHEDULE.
Details: (Hour: 9 / Preferred: 12.00 / Final: 13.00)
TRANS_TYPE: FINAL
SC_ID: Wheelabrat
MKT_TYPE: 2
TRANS_DATE: 4/5/01
UNIT_ID: MARTEL_2_AMFOR
$$$ Variance found in table tblGEN_SCHEDULE.
Details: (Hour: 9 / Preferred: 29.00 / Final: 22.63)
TRANS_TYPE: FINAL
SC_ID: ARCO
MKT_TYPE: 2
TRANS_DATE: 4/5/01
UNIT_ID: CARBGN_6_UNIT 1
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 9 / Preferred: 61.96 / Final: 56.56)
TRANS_TYPE: FINAL
LOAD_ID: PGE3
MKT_TYPE: 2
TRANS_DATE: 4/5/01
SC_ID: EPMI