24 Apr 2000, 13:29 UTC
Interconnect Agreement
- From
- Gerald Nemec gerald.nemec@enron.com
- Date
- Mon, 24 Apr 2000 06:29:00 -0700 (PDT)
The sender added no text of their own; everything below is quoted or forwarded.
Quoted or forwarded from earlier messages
---------------------- Forwarded by Gerald Nemec/HOU/ECT on 04/24/2000 01:29 PM --------------------------- Robert D Morgan 04/18/2000 12:12 PM To: Gerald Nemec/HOU/ECT@ECT cc: Brian M Riley/HOU/ECT@ECT Subject: Interconnect Agreement In the short-term, I need two agreements: 1) A delivery point from LRC to SkyGen Energy LLC at the Cosmar plant in Ascension Parish, La. Bridgeline Holdings will install, own, and operate 5369' of 8" and the 100MM/D measurement station. Next week would be okay. 2) A bi-directional point between HPL and Tejas. The details are still being negotiated. If possible, I would like it Wedesday EOB. Item Install Own Operate 11mile of 16 Header Tejas Tejas Tejas 12 on 30 Hot Tap for Texoma HPL HPL HPL 1600, of 16 between Texoma and M&R Tejas HPL HPL Check Measurement (Flow Computer, SCADA) Tejas Tejas Tejas OPP to protect HPL Tejas HPL HPL Custody Measurement Tejas HPL HPL Flow/Pressure Control Tejas HPL HPL Over-Ride Control Tejas Tejas Tejas Easement for Hot Tap Tejas HPL HPL ROW for 1600' Tejas HPL HPL Easement for Measurement Tejas HPL HPL