19 Apr 2001, 18:32 UTC

NWP System Notice - 01-235 NWP Available Capacity

From
Miki Bode miki.bode@williams.com
To
abenton@utilicorp.com, agcdu1@triax.com, agcdu6@triax.com, anita.reubens@swgas.com, bblanar@coral-energy.com, bob.mattice@engageenergy.com, browning@wasatchenergy.com, bruce.langmade@fortjamesmail.com, bymank@wdni.com, cards@wdni.com, caver_ordal@pgn.com, ccoyle@americansoda.com
and 48 more cmcgra@puget.com, cpavlica@enerad.com, craig.provenzano@powersrc.com, cridin@puget.com, cslaman@usg.com, cwduke@duke-energy.com, darena@national-energy.com, dave.dungan@weyerhaeuser.com, deborahs@kimballenergy.com, derek.danyliw@husky-oil.com, dlh@nwnatural.com, fermis@enron.com, geek@bp.com, gilesmh@bp.com, janderson@clarkpud.com, jane@itcoworld.com, jennifer_owen@pgn.com, jmmcarthur@duke-energy.com, jsanders@clarkpud.com, kims@kimballenergy.com, klambe@puget.com, llightfoot@coral-energy.com, lmansi@sdge.com, lprior@enron.com, mcano@enerad.com, michelle_hunter@pgn.com, niels_a_vervloet@reliantenergy.com, pschmidt@kimballresources.com, ramperms@bp.com, rcooper@usg.com, rfm@nwnatural.com, robert.harp@engageenergy.com, rony@panalberta.com, Ryan Watt, sakom@global.net, sbrewer@enron.com, scotts@kimballenergy.com, sghill@bcgas.com, spjutd2@wdni.com, ssouth@enron.com, Stephane Brodeur, tdizona@coral-energy.com, tjmi@dynegy.com, tom.mckay@engageenergy.com, val_yildirok@pgn.com, wharlan@kimballresources.com, zcourns@national-fuel.com, jshadie@idahopower.com
Date
Thu, 19 Apr 2001 11:32:00 -0700 (PDT)
Post Date: April 19, 2001 
Category: SHORT-TERM FIRM CAPACITY 
Subcategory: NWP OFFERS 
Subject: 01-235 NWP Available Capacity 

Notice Text: 
All Shippers Notification:? 01-235?????? Dated : April 19, 2001 

NORTHWEST PIPELINE'S 
NOTICE OF AVAILABLE AND 
POTENTIALLY AVAILABLE FIRM 
TRANSPORTATION CAPACITY1) 

NOTE:? REMAINING LIMITED TERM 
MITIGATED TRANSPORTATION 
CAPACITY HAS BEEN ADDED TO 
THIS NOTICE 

********************************************************************** 
Capacity Below Available 
?for TF-1 Service Only 

??????????????????????????????????????????????????????????????????????????????
??????? Total???? Available 
Pkg? Receipt Point2)????????? Delivery Point2)?????????? Dth/d?????? Date3)?? 

A??? Sumas?????????????????????????? Puget(Canyon)??????????? 15,000?????? 
NOW- 
??????????????????????????????????????????????????????????????????????????????
??????????????????????? 10/14/01 

B??? Sumas????? ?????????????????????? Kern River/Muddy Crk.? 8,272????? NOW- 
??????????????????????????????????????????????????????????????????????????????
???????????????????????? 06/01/03 

B-1? Sumas????? ?????????????????????? Kern River/Muddy Crk.? 1,500 9) 
11/01/01- 
??????????????????????????????????????????????????????????????????????????????
????????????????????????? 06/01/03 

C??? Sumas(1160)??????????????? Kemmerer?????????????????????? 2,750?????? 
NOW 
???? Ignacio Plant(1590) 

D??? Sumas(2,390)?????????????? Monticello(330)??????????????? 6,016?????? 
NOW 
???? Ignacio(3,626)??????????????? Rio Algom(300) 
???????????????????????????????????????????? Moab#2(1,861) 
???????????????????????????????????????????? Moab(2,283) 
???????????????????????????????????????????? Arches National Park(17) 
???????????????????????????????????????????? Vernal(653) 
???????????????????????????????????????????? Dutch John(125) 
???????????????????????????????????????????? Redwash(447) 

E??? Starr Road??????????????????? Inland Paper??????????????????????? 
830??????? 05/01/01 8) 

F??? Stanfield?????????????????????? Stanfield??????????????????????????? 
3,681??????? 06/01/01 9) 

F-1? Stanfield????????????????????? Stanfield????????????????????????? 
14,490??????? 04/01/02 10) 

G??? Shute Creek?????????????? Ignacio-Bondad (EPNG)? 10,000?????? NOW 

G-1? Shute Creek????????????? Ignacio-Bondad (EPNG)? 40,000?????? 06/01/01 9) 

G-2? Shute Creek????????????? Ignacio-Bondad (EPNG)? 25,000?????? 11/01/01 9) 

H??? Opal Plant??????????????????? Western Mkt Center?????? 90,000?????? 
06/01/01 9) 

I??? Painter???????????????????????? Muddy Creek (KERN)?????????? 8,351?????? 
05/01/01 8) 

I-1? Painter??????????????????????? Muddy Creek (KERN)???????? 35,000?????? 
06/01/01 9) 

J??? Western Mkt Center?? Crossover 16-Questar?? 50,415?????? 06/01/01 7) 9) 

K??? Western Mkt Center?? Clay Basin`???????????????????????? 4,585?????? 
06/01/01 7) 9) 

L??? Crossover 16?????????????? Green River-CIG?????????????? 23,152?????? 
NOW 7) 8) 

M??? Crossover 16????????????? Clay Basin???????????????????????? 
10,000??????? 06/01/01 7) 9) 

M-1? Crossover 16???????????? Clay Basin???????????????????????? 17,263?????? 
NOW 7) 

N??? Green Rvr/McKinn-CIG Clay Basin??????????????????????? 23,152?????? 
05/01/01 7) 8) 

O??? Clay Basin??????????????????? Chevron Rangely(6093)???? 7,488??????? 
06/01/01 9) 
????????????????????????????????????????????? Vernal (1395) 

P??? Clay Basin???????????????????? Redwash/Questar??????????? 19,240?????? 
11/01/01 7) 9) 

Q??? Clay Basin??????????????????? 
Rifle?????????????????????????????????????? 1,850??????? NOW 7) 

Q-1? Clay Basin?????????????????? Rifle?????????????????????????????????????? 
7,770??????? 06/01/01 7) 9) 

R??? Clay Basin??????????????????? American Soda Ash??????????? 1,140??????? 
NOW 7) 8) 

S??? Jensen (Ut Gas Svc)? Green River-CIG????????????????????? 316??????? 
06/01/01 8) 9) 

T??? Redwash/Chevron????? Green River-CIG????????????????? 1,850??????? NOW 
8) 

U??? Redwash/QPC????????????? Rifle?????????????????????????????????????? 
1,050??????? 06/01/01 7) 9) 
???? 
V??? Greasewood?????????????? Clay Basin???????????????????????????? 
2,765??????? NOW 8) 

W??? Piceance Quick Cycle Green River-CIG???????????????? 1,005??????? NOW 8) 

X??? Barrett??????????????????????????? Kern River?????????????????????????? 
4,097??????? 06/01/01 9) 
? 
Y??? Barrett?????????????????????????? Green River-CIG????????????????? 
6,460??????? NOW 8) 

Z??? North Douglas????????????? Green River-CIG????????????????? 3,178??????? 
NOW 8) 

AA?? Sand Springs????????????? Ignacio-Bondad (EPNG)?? 23,148??????? 11/01/01 
4,10) 

BB?? West Douglas???????????? Clay Basin??????????????????????????? 
2,354???????? NOW 8) 

CC?? Calf Canyon(410)??????? Kern River????????????????????????????? 
703??????? 01/01/02 9) 
???? Foundation Crk.(293) 

DD?? Lisbon?????????????????????????? Green River-CIG??????????????? 
2,600???????? NOW 8) 

EE?? Grand Valley????????????????? Green River-CIG?????????????? 
1,137???????? NOW 8) 

FF?? Grand Gas????????????????????? Green River-CIG?????????????? 
1,000????????? NOW 8) 

GG?? Ignacio Plant???????????????? Green River-CIG???????????? 10,000???????? 
06/01/01 9) 

GG-1 Ignacio Plant?????????????? Green River-CIG?????????????? 1,424????????? 
NOW 8) 

GG-2 Ignacio Plant?????????????? Green River-CIG?????????????? 1,177????????? 
NOW 

GG-3 Ignacio Plant????????????? Green River-CIG??????????????? 5,000????????? 
05/01/01 10) 

HH?? Ignacio Plant??????????????? Grand Junction????????????????? 
4,000????????? 06/01/01 9) 

HH-1 Ignacio Plant??????????????? Grand Junction???????????????? 
4,310????????? NOW 8) 

II?? Ignacio Plant??????????????????? Ignacio -Bondad (EPNG) 25,000????????? 
NOW 8) 

II-1 Ignacio Plant?????????????????? Ignacio -Bondad (EPNG) 25,000???????? 
11/01/01 9) 

JJ?? Blanco Hub-TW????????????? Green River-CIG????????????? 24,000???????? 
06/01/01 9) 

JJ-1 Blanco Hub-TW???????????? Green River-CIG????????????? 61,463???????? 
NOW 

********************************************************************** 
Jackson Prairie Receipt Point Capacity 
Available for TF-1 or TF-2 Service as specified 
below 

KK?? Jackson Prairie??????????? SIPI??????????????????????????????????? 
47,341?????????? NOW 5)8) 
???? (55,715)???????????????????????????? 
Lynden????????????????????????????????? 592????? 
??????????????????????????????????????????????? 
Lawrence?????????????????????????????? 81?????? 
??????????????????????????????????????????????? 
ACME?????????????????????????????????????? 68?????? 
??????????????????????????????????????????????? Mt. 
Vernon?????????????????????????? 115????? 
??????????????????????????????????????????????? 
Sedro/Woolley????????????????? 3,988??? 
??????????????????????????????????????????????? LDS 
Church????????????????????????? 133????? 
??????????????????????????????????????????????? Granite 
Falls????????????????????? 1,536??? 
??????????????????????????????????????????????? 
Machias????????????????????????????? 1,840??? 
?????????????????????????????????????????????? 
Snohomish????????????????????????????? 21?????? 

LL?? Jackson Prairie??????????? Echo Lake??????????????????????????????? 
33?????? NOW 5)8) 
???? (7,530)?????????????????????????????? Duval/Cottage Lake????????????? 
183???? 
??????????????????????????????????????????????? 
Redmond??????????????????????????? 3,293?? 
??????????????????????????????????????????????? May 
Valley???????????????????????????? 300 
??????????????????????????????????????????????? Lake 
Francis????????????????????? 2,808?? 
?????????????????????????????????????????????? 
Covington?????????????????????????????? 263???? 
??????????????????????????????????????????????? Black 
Diamond????????????????????? 450???? 
??????????????????????????????????????????????? 
Enumclaw????????????????????????????? 200???? 

MM?? Jackson Prairie????????? Sedro/Woolley?????????????????? 8,300????? 
05/01/04 5)10) 

NN?? Jackson Prairie??????????? South Lake?????????????????????? 35,500????? 
NOW 6) 
?? 
OO?? Jackson Prairie??????????? Idaho State Pen.??????????????? 1,735????? 
NOW 6) 

PP?? Jackson Prairie???????????? Kern River/Muddy Crk.? 98,069????? NOW 6) 

QQ?? Jackson Prairie???????????? Shute Creek???????????????????? 7,688?????? 
NOW 6) 

RR?? Jackson Prairie????????????? Pocatello?????????????????????????? 
1,198?????? NOW 6) 


************************************************************************ 
Mitigated Volumes for 2001 
Only available for Time Periods Listed 

SS?? Sumas??????????????? Reno Lateral?????????? 2,385?? April Only 

SS-1 Sumas??????????????? Reno Lateral?????????? 3,399?? May Only 

SS-2 Sumas??????????????? Reno Lateral?????????? 3,764?? June Only 

SS-3 Sumas??????????????? Reno Lateral?????????? 4,243?? July Only 

SS-4 Sumas??????????????? Reno Lateral?????????? 4,341?? August Only 

SS-5 Sumas??????????????? Reno Lateral?????????? 3,922?? September Only 

SS-6 Sumas??????????????? Reno Lateral?????????? 2,076?? October Only 

TT?? Sumas??????????????? LaGrande???????????????????? 500?? Jun, Jul, Aug 
??????????????????????????????????????????????????????????????????????????????
??????? or Sept -- 
??????????????????????????????????????????????????????????????????????????????
?????? or Jun - Sept 
? 
UU?? Sumas??????????????? Spokane Mead?????????? 2813??? Jun, Jul, Aug 
??????????????????????????????????????????????????????????????????????????????
???????? or Sept - 
??????????????????????????????????????????????????????????????????????????????
???????? or Jun - Sept 

VV?? Starr Road?????????? Spokane-Kettle Falls?? 401??? Jun, Jul, Aug 
??????????????????????????????????????????????????????????????????????????????
?????????? or Sept - 
??????????????????????????????????????????????????????????????????????????????
?????????? or Jun - Sept 

WW?? Klamath????????????? Klamath???????????????????????? 263???? Jun, Jul, 
Aug 
??????????????????????????????????????????????????????????????????????????????
?????????? or Sept - 
??????????????????????????????????????????????????????????????????????????????
??????????? or Jun - Sept 

XX?? Sumas??????????????? Reno??????????????????????????????? 281???? Jun, 
Jul, Aug 
??????????????????????????????????????????????????????????????????????????????
?????????? or Sept - 
??????????????????????????????????????????????????????????????????????????????
?????????? or Jun - Sept 

************************************************************************ 

1) This notification supercedes all previous Notices of Available and 
Potentially Available Capacity and is subject to change at any time. 

2) Other receipt and delivery points utilizing the described 
??? transportation corridor may be available. 

3)? Potential Availability date for the Capacity. 

4)? Contracts shall include the following subordinate scheduling 
??? provision if the requested term extends into a critical operational 
??? period: 

To the extent Shipper's nominated volumes are not scheduled solely 
due to Shipper's subordinate scheduling priorities set forth below, 
the monthly base reservation charge will be discounted to $0.00 per 
Dth for that quantity only. 

Section 14.1(c)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights through any mainline constraint 
from the Sand Springs receipt point to the Ignacio Bondad (or 
LaPlata-TW) delivery point(s) to have a scheduling priority which 
will be subordinate to the scheduling priority for any firm shipper 
with primary corridor rights that encompass and extend beyond the 
Sand Springs to Ignacio Bondad (or LaPlata-TW) corridor. 

5) Available for TF-1 or TF-2 transportation service.? TF-2 service 
will not be discounted below Northwest's current Tariff filed rate 
for TF-2 service.? Additionally, TF2 service must be linked to 
requester's designated storage contract or storage ownership 
right. TF-2 service shall include the following subordinate 
scheduling priority language: 

Section 14.1(d)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights from the Jackson Prairie receipt 
point to the _____________ delivery point to have a scheduling 
priority at any northflow constraint point in that corridor that is 
subordinate to the scheduling priority for any firm service with 
unconditioned primary corridor rights through such constraint point. 

6)??? Available for TF-2 transportation service only. TF-2 service will 
not be discounted below Northwest's current Tariff filed rate for 
TF-2 service.? Additionally, TF2 service must be linked to 
requester's designated storage contract or storage ownership 
right.? TF-2 service shall include the following subordinate 
scheduling priority language: 

Section 14.1(d)(i) of Northwest's tariff is modified to condition 
Shipper's primary corridor rights from the Jackson Prairie receipt 
point to the _____________ delivery point to have a scheduling 
priority at any southflow constraint point in that corridor that is 
subordinate to the scheduling priority for any firm service with 
unconditioned primary corridor rights through such constraint point. 

7)??? Capacity is not to exceed a one month primary term with evergreen 
?? language.? Any offers with terms greater than one month will need to 
?? be evaluated for possible seasonal flow conditions that may restrict 
?? the available capacity beyond a one month term. 

8)??? This capacity is currently under contract with an evergreen clause 
??? This capacity can be made available by providing one business day 
?? written termination notification to the current holder of the 
????? capacity.? This means that termination notification must be received 
no later than 5:00 p.m. Mountain Current Time, 24 hours (1 business 
day) prior to the effective date of the contract termination. 

9)??? This capacity is currently under contract with an evergreen clause. 
?? This capacity can be made available by providing ten business days 
prior written termination notification to the current holder of the 
capacity.? This means termination notification must be received no 
later than 5:00 p.m. Mountain Current Time on the eleventh business 
day prior to the beginning of the next month. 

10) This capacity is currently under contract and does not contain an 
?? evergreen clause. 

11) This capacity is "mitigated" capacity and will not contain an 
?????? evergreen clause. 

12) This capacity is available only for the term offered.? No evergreen 
clause available. 

13)??? This capacity is currently under contract with an evergreen clause. 
????? This capacity can be made available by providing a one year prior 
????? written termination notification to the current holder of the 
????? capacity. 

14) Available for TF-2 transportation service only. TF-2 service will 
????? not be discounted below Northwest's current Tariff filed rate for 
????? TF-2 service.? Additionally, TF2 service must be linked to 
????? requester's designated storage contract or storage ownership 
????? right. 




PROCEDURE FOR REQUESTING AVAILABLE AND 
POTENTIALLY AVAILABLE 
TRANSPORTATION CAPACITY 

To request Potentially Available Transportation Capacity available on 
the first day of June 2001, Shipper must submit a Prearranged Offer in 
the form of the Letter Agreement provided below.? This Letter Agreement 
must be received by Northwest no later than 5:00 pm Central Time on May 
15, 2001.? Northwest will accept or reject the Prearranged Offer by no 
later than the end of the gas day on May 16, 2001. If the Prearranged 
Offer is acceptable, Northwest will provide a 10-bursiness day prior 
termination notice to the current holder of the Capacity, post the 
Prearranged Offer for bid, and Award the capacity no later than two 
business days after the Bid Close Date.? Unless otherwise specified in 
this posting, bids will be evaluated and awarded pursuant to the 
procedure set forth in Northwest's tariff. 

To request the Potentially Available Transportation Capacity with the 
one business day termination provisions as indicated by footnote "8)", 
?Shipper must submit a Prearranged Offer in the form of the Letter 
Agreement provided below.? Upon receipt of this Letter Agreement 
Northwest will either accept or reject the Prearranged Offer within 
24-hours. If the Prearranged Offer is acceptable, Northwest will provide 
the one business day termination notice to the current holder of the 
Capacity, post the Prearranged Offer for bid, and Award the capacity no 
later than two business days after the Bid Close Date.? Unless otherwise 
specified in this posting, bids will be evaluated and awarded pursuant 
to the procedure set forth in Northwest's tariff. 

To request Available Transportation Capacity, Shipper must immediately 
submit a Prearranged Offer in the form of the Letter Agreement provided 
below.? Northwest will accept or reject the Prearranged Offer within two 
(2) business days of receipt of the prearranged offer.? If the 
Prearranged Offer is acceptable, Northwest will post the Prearranged 
Offer for bid, and Award the capacity no later than two business days 
after the Bid Close Date.? Unless otherwise specified in this posting, 
bids will be evaluated and awarded pursuant to the procedure set forth 
in Northwest's tariff. Northwest has the right to re-post Available 
capacity for bid ith or without prearranged offers. 


??????? _________________(Date) 


____________________________ (Company Name) 
____________________________ (Company Address) 
____________________________ (City, State, Zip) 

VIA FACSIMILE - (801) 584-7076 

Northwest Pipeline Corporation 
c/o Williams Gas Pipelines - West 
Attn: Candace C.? Karpakis 
295 Chipeta Way 
Salt Lake City, UT 84158 

Re:???? Prearranged Offer for Available or Potentially Available 
Transportation Capacity on Williams' Northwest Pipeline Transmission System

Dear Candace: 

_______________________ ("Shipper") submits the following bid for available 
or potentially available transportation capacity ("Capacity") designated as 
package _____ on Northwest Pipeline Corporation's ("Northwest") "Notice of 
Available or Potentially Available Firm Transportation Capacity" dated April 
19, 2001.?? Shipper recognizes and agrees that the Capacity will be subject 
to the Special Conditions set forth in this posting.? Shipper's request? is?? 
or?? is not?? (circle one) contingent upon confirmation that its offered 
discount rate provides use of receipt/delivery points outside the 
receipt/delivery point corridor specified in the package.? If maximum rate is 
offered, this provision does not apply.? Shipper understands that its 
prearranged offer is subject to the Special Conditions described below. 

Shipper understands that Northwest will post the prearranged details of this 
offer for such Capacity for bidding and Shipper will have the right to match 
the highest bid value upon close of the bid process.? Northwest will not 
disclose the identity of the prearranged bidder in such posting.

Service Type:?????????? TF-1 Large Customer 

Contract Demand(Dth/d): ____________________ 

Receipt Point(s) ______________________________________________________ 

Delivery Point(s)______________________________________________________ 

Daily Reservation Rate: $_______/Dth? (applicable surcharges, volumetric 
charge & fuel are additive) 

Term:______________________________to___________________________________ 

Evergreen Requested (circle one):?????? Yes?? or???? No 

Identity of any affiliate of Northwest involved in Shipper's transaction: 
Indicate "None" or "Name the Affiliate": 
_________________________________________________ 

Northwest's acceptance of Shipper's prearranged offer for the Capacity 
will constitute a binding agreement between Northwest and Shipper. 
Shipper shall be awarded the Capacity at the terms agreed upon in this 
Letter Agreement if no bids are received with a greater economic value for 
such Capacity during the bid process. If Shipper elects to match a bid 
with a greater economic value, it shall be awarded the Capacity according 
to the terms of the matched bid. Shipper agrees to electronically execute 
a service agreement on Northwest's Electronic Bulletin Board which 
confirms the terms of the final accepted transaction. 

If you have questions or comments regarding the above referenced 
information, please contact __________________________ at 
______________________(Phone Number) ______________________(Fax Number). 

Sincerely, 

______________________________ 
?????????????? (Name) 
______________________________ 
?????????????? (Title) 

(Accepted? /? Rejected) by Northwest: 

Date: _______________?? Name: ________________________________ 

SPECIAL CONDITIONS 
(For Prearranged Offer Agreement) 

If the prearranged offer for the Capacity is accepted at a discount rate 
which provides for the use of receipt/delivery points outside the 
specified receipt/delivery point corridor for the Capacity, the accepted 
prearranged offered discount rate shall apply no matter which receipt and 
delivery points are utilized by Shipper, or any temporary replacement 
Shipper, under capacity release transactions, including segmented 
releases.? If the accepted prearranged offered discount rate for the 
Capacity does not provide for use of receipt/delivery points outside the 
specified receipt/delivery point corridor for the Capacity, the accepted 
prearranged offered discount rate shall apply to Shipper, or any temporary 
replacement Shipper, only to the extent that both Shipper and any 
temporary replacement Shipper utilize receipt points within their 
respective primary firm receipt/delivery point to primary firm delivery 
point corridors, otherwise, Shipper will be liable for Northwest's maximum 
tariff rates. 

If you are interested in discussing any of the 
Available or Potentially Available Capacity, please 
call Candace Karpakis at (801) 584-6996 (work) or at 
(801) 971-5983 (cellular). 

Word:F:\NWP Capacity Postings\2001 All Shipper Notices\01-235 4-19-01 