19 Sep 2001, 19:52 UTC
RE: Atoka Cost
- From
- Mansoor Abdmoulaie mansoor.abdmoulaie@enron.com
- To
- Earl Chanley
- Bcc
- Kimberly Watson
- Date
- Wed, 19 Sep 2001 12:52:10 -0700 (PDT)
Earl We have a set of Engineering Standards in Planning common drive and Eric is sending them to you right now. Please select whatever you need to send to Agave ASAP. Regards, Mansoor
Quoted or forwarded from earlier messages
-----Original Message----- From: Chanley, Earl Sent: Wednesday, September 19, 2001 1:22 PM To: 'dlanning@ytcnm.com' Cc: Watson, Kimberly; Abdmoulaie, Mansoor Subject: FW: Atoka Cost David This is the equipment for the proposed interconnect. The Enron "e"nternet is down at this time and I will e-mail your the Engineering Standards when it is running. Jim Williams will be here this PM and I will give him a typical I/C package drawing and Material list set that you can review. This is a typical set and for your proposed I/C, a few modifications to package would be required but it is 80% of what is used at most I/C. You can develop a cost estimate from this package with your modifications. If any questions or if I can be of assistance, please contact me. Earl Chanley 505-625-8031 -----Original Message----- From: Chanley, Earl Sent: Monday, September 10, 2001 7:20 AM To: Abdmoulaie, Mansoor Subject: Atoka Cost Mansoor The I/C is a 10" UltraSonic designed for a range of 35 mmcfd to +100 mmcfd. By using the US meter, this allows a wide range of volumes without changing out the tube when Agave want to increase the volumes. I/C to include US meter H2S H2O Chromatograph Flow control Positive Shut in EFM DAS UPS Building GFC Material cost = Install cost (contractor, inspection, Dlab, Eng, Proj. man) = Contingency = OH, AFUDC, =