Enron email

Algorithmic Indexing

13 Feb 2001, 23:52 UTC

Physical positions in NCD

From
Mike Grigsby mike.grigsby@enron.com
To
Anne Bike, Monique Sanchez
Date
Tue, 13 Feb 2001 15:52:00 -0800 (PST)
Please make certain that all physical positions are loaded correctly in NCD 
for term.  Have Patti Sullivan load all transport from the transport model in 
sitara so that the physical index positions will be recognized in NCD.   This 
would include SJ/Perm to Socal through OCT, Baja through MAR 20001 (100,000/d 
short PG&E Topock, 20,000/d long KRS, and 80,0000/d long Citygate), Kingsgate 
to Malin(Barry), Steve South's latest transport deal from Kingsgate/Stanfield 
to Malin, and any SJ to Waha transport.  

Anne, did you get a ticket from Steve on the transport mentioned above?  
King/Stan to Malin.

Also, let me know what the status of the transport deal from Kingsagte to 
Malin with Barry.  

Is the gd index for Perm position loading correctly in NCD for Apr-Oct?

Mo, please carry out the physical positions in NCD through Mar 2001. 

Thanks!

Mike