6 Apr 2001, 13:43 UTC
Start Date: 4/6/01; HourAhead hour: 14; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Bcc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Date
- Fri, 6 Apr 2001 06:43:00 -0700 (PDT)
Start Date: 4/6/01; HourAhead hour: 14; No ancillary schedules awarded.
Variances detected.
Variances detected in Energy Import/Export schedule.
Variances detected in SC Trades schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001040614.txt
---- Energy Import/Export Schedule ----
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 14 / Preferred: 12.00 / Final: 11.98)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 4/6/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_SCOUT
ENGY_TYPE: WHEEL
---- SC Trades Schedule ----
$$$ Variance found in table tblInt_Interchange.
Details: (Hour: 14 / Preferred: -545.00 / Final: -544.98)
TRANS_TYPE: FINAL
SC_ID: EPMI
MKT_TYPE: 2
TRANS_DATE: 4/6/01
TRADING_SC: NES1
PNT_OF_INTRC: SP15
SCHED_TYPE: ENGY
PURCH_SALE: 1
DEAL_NO: 1
*** Final schedule not found for preferred schedule.
Details:
TRANS_TYPE: FINAL
SC_ID: EPMI
MKT_TYPE: 2
TRANS_DATE: 4/6/01
TRADING_SC: PGAE
PNT_OF_INTRC: ZP26
SCHED_TYPE: ENGY
PURCH_SALE: 2
DEAL_NO: 1
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 14 / Preferred: 6.40 / Final: 6.08)
TRANS_TYPE: FINAL
LOAD_ID: SCE1
MKT_TYPE: 2
TRANS_DATE: 4/6/01
SC_ID: EPMI