Enron email

Algorithmic Indexing

7 Mar 2000, 13:50 UTC

Downstairs Apartment

From
Tana Jones tana.jones@enron.com
To
lofeco@eul.net
Date
Tue, 7 Mar 2000 05:50:00 -0800 (PST)
Below is the list of the final work we need you to bid on for the downstairs 
apartment:

1.  Paint inside of bathroom cabinets
2.  Paint outside and inside of kitchen cabinets
3.  Fix bottom of drawer of kitchen cabinet located right of dishwasher
4.  Replace closet rod in front bedroom to match other closet's rod
5.  Hammer down shelf ends that are loose in closet in back bedroom
6.  Clean ends of door hardware that have drips on them.
7.  Rehang blinds (we'll have to buy new hardware for existing blinds and 
then I will have to buy new blinds if any were bent by the kids)

Did I catch everything?