9 Jan 2002, 22:24 UTC
Trans Pecos
- From
- Kimberly Watson kimberly.watson@enron.com
- Bcc
- James Centilli
- Date
- Wed, 9 Jan 2002 14:24:38 -0800 (PST)
Steve, James re-ran Trans Pecos with the following: Term: 20 years Rate: $0.261 Volume: 240,000 MMBtu/d Cost: $130.274MM (Without cost of NNG I/C and over-run up to $143.9MM) then ROE: 12.38% If Cost is capped at $130.274 (no over-run), then ROE is 15.25% --------------------------------------------------------------------------------------------------------------------------------- Term: 15 Years Rate: $0.261 Volume: 240,000 MMBtu/d Cost: $130.27 (Without cost of NNG I/C and over-run up to $143.9MM) then ROE: 10.82% If Cost is capped at $130.274 (no over-run), then ROE is 13.8% --------------------------------------------------------------------------------------------------------------------------------- Let's discuss tomorrow morning. Kim.