1 Aug 2001, 12:59 UTC
ARCO Outage Schedule with the ISO
- From
- Ryan Slinger ryan.slinger@enron.com
- Bcc
- Chris H. Foster
- Date
- Wed, 1 Aug 2001 05:59:11 -0700 (PDT)
We had some problems scheduling ARCO as the ISO had a 10.8 mw curtailment scheduled for ARCO through HE 24 for 8/1/01. In order to schedule the extra 6mw for 8/1/01 I had to change that outage and set the curtailment at 5mw and that is scheduled through 9/1/01. The ISO had two separate outage schedules and I said to just go with the 5mw curtailment until you guys could get back with them on the exact outage. Thanks, ryan