9 Apr 2001, 04:41 UTC
Start Date: 4/9/01; HourAhead hour: 5; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Bcc
- Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
- Date
- Sun, 8 Apr 2001 21:41:00 -0700 (PDT)
Start Date: 4/9/01; HourAhead hour: 5; No ancillary schedules awarded.
Variances detected.
Variances detected in Generation schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001040905.txt
---- Generation Schedule ----
$$$ Variance found in table tblGEN_SCHEDULE.
Details: (Hour: 5 / Preferred: 45.00 / Final: 43.97)
TRANS_TYPE: FINAL
SC_ID: DELANO
MKT_TYPE: 2
TRANS_DATE: 4/9/01
UNIT_ID: PANDOL_6_UNIT
---- Energy Import/Export Schedule ----
*** Final schedule not found for preferred schedule.
Details:
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 4/9/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_OZZY
ENGY_TYPE: FIRM
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 5 / Preferred: 1.93 / Final: 1.90)
TRANS_TYPE: FINAL
LOAD_ID: PGE4
MKT_TYPE: 2
TRANS_DATE: 4/9/01
SC_ID: EPMI
$$$ Variance found in table tblLoads.
Details: (Hour: 5 / Preferred: 57.83 / Final: 39.83)
TRANS_TYPE: FINAL
LOAD_ID: SCE1
MKT_TYPE: 2
TRANS_DATE: 4/9/01
SC_ID: EPMI