28 Sep 2000, 15:02 UTC
DG Update
- From
- Bruno Gaillard bruno.gaillard@enron.com
- Date
- Thu, 28 Sep 2000 08:02:00 -0700 (PDT)
So sorry, I thought I had sent out this e-mail on my last day 9-6-00. Instead I had saved it as a draft. Some of the information is out of date, but useful for reference. Interconnection Workshop Report: The supplemental CEC Draft Committee Report was issued 9/1/00. The Report will be heard at the CEC on 9/7. We will have an opportunity to file written comments on the draft report if the issue is not fully addressed at the hearing. Written comments must be served on the 99-DIST-GEN(2) service list and received by the Energy Commission by 5:00 pm, Pacific Daylight Time on September 15, 2000. No late filings will be accepted under any circumstances. For purposes of meeting the deadline, however, you can e-mail your comments to Scott Tomesheski at tomashe@energy.state.ca.us by the above-mentioned deadline. We will still need to file an original and 10 sets of written comments to the Energy Commission docket office. The Siting Committee is expected to release a revised report by September 29th. The full Commission anticipates considering the supplemental recommendation for approval at its October 18th business meeting. Bob Frank has been added to the distribution list. Interconnection Rules: The interconnection rules do not address Exporting. They do not prevent Exporting. This is good because modification to the rules would have to be done by petition to modify the final decision Interconnection Agreement: We managed to not exclude Exporting from the DG interconnection Agreement. however, the agreement does not explicitly address. Exporting. It allows for supplemental agreements to be attached to the extent that they are under the CPUC jurisdiction. If the CPUC asserts jurisdiction over the retail wheeling, the agreement will be valid and will need additional attachments. Modifications to this document can be done by Advice Letter filing. Interconnection Application: This document does not include exporting, except if you are QF and exporting under 100 kW. Once approved, modifications to this document to this document can be done by Advice Letter filing. We may want to address this issue in written comments by 9/7. We may also want to wait how the CPUC rules on retail wheeling and then address the issue. ISO issues: The ISO will be filling at the FERC metering and scheduling requirement for DG units - Participating Generators or other. The ISO intends to file at FERC shortly. I asked Jeanne Sole of the ISO to contact Sue with the schedule.In short the ISO would like to require that gross Load and generation be Scheduled by the ISO at the transmission as well as Distribution level. The ISO intends to require all participating generation of 1 MW and above and all Generation of 10 MW and above to meter there gross generation (whether for self consumption or export. They intend to require telemetric meters, resulting in high installation, purchase and operational costs. They also intend to apply GMC and TAC on gross generation including generation for self consumption.