26 Mar 2002, 11:18 UTC
Request for SCADA power curves
- From
- Philippe Giguere philippe.giguere@enron.com
- To
- Mark Fisher
- Date
- Tue, 26 Mar 2002 03:18:00 -0800 (PST)
Mark: As per our phone conversation, please generate these two bin-averaged power curves for turbine #2 at Montfort. 1) Consider all data from the month of February 2) Consider data only from Feb. 9 to the end of February Please use 0.5 m/s bins. The prefered output for this work is a single plot showing both power curves. Getting these results by the end of this week would be perfect. Thanks, Philippe