26 Apr 2001, 17:58 UTC
Meter 1558 April 2001
- From
- Juliann Kemp juliann.kemp@enron.com
- Date
- Thu, 26 Apr 2001 10:58:32 -0700 (PDT)
Cerrito Lastiendas - has meter flow on the 7th and the deal ended on the 6th. Can we extend the deal for the 48 mmbtu's that flowed or can I override the meter and add it to a day that flowed less than the nom? The third had 4861 and the nom was for 5000. Thanks - Julie