21 Apr 2001, 23:43 UTC
Start Date: 4/21/01; HourAhead hour: 24; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
and 1 more
Steven Merris - Bcc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
and 1 more
Steven Merris - Date
- Sat, 21 Apr 2001 16:43:00 -0700 (PDT)
Start Date: 4/21/01; HourAhead hour: 24; No ancillary schedules awarded.
Variances detected.
Variances detected in Generation schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001042124.txt
---- Generation Schedule ----
*** Final schedule not found for preferred schedule.
Details:
TRANS_TYPE: FINAL
SC_ID: HARBOR
MKT_TYPE: 2
TRANS_DATE: 4/21/01
UNIT_ID: HARBGN_7_UNITS
$$$ Variance found in table tblGEN_SCHEDULE.
Details: (Hour: 24 / Preferred: 29.00 / Final: 28.97)
TRANS_TYPE: FINAL
SC_ID: ARCO
MKT_TYPE: 2
TRANS_DATE: 4/21/01
UNIT_ID: CARBGN_6_UNIT 1
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 24 / Preferred: 4.83 / Final: 4.80)
TRANS_TYPE: FINAL
LOAD_ID: PGE2
MKT_TYPE: 2
TRANS_DATE: 4/21/01
SC_ID: EPMI