3 May 2000, 10:39 UTC
Gallup - Status Update, May 4, AM
- From
- Drew Fossum drew.fossum@enron.com
- Bcc
- Mary Kay Miller
- Date
- Wed, 3 May 2000 03:39:00 -0700 (PDT)
Please call when you've reviewed this. Thanks. DF
Quoted or forwarded from earlier messages
---------------------- Forwarded by Drew Fossum/ET&S/Enron on 05/03/2000 10:36 AM --------------------------- From: Susan Scott 05/03/2000 08:46 AM To: Drew Fossum@ENRON, Donna Martens/ET&S/Enron@ENRON cc: Subject: Gallup - Status Update, May 4, AM FYI ---------------------- Forwarded by Susan Scott/ET&S/Enron on 05/03/2000 08:44 AM --------------------------- James Pfeffer@ENRON_DEVELOPMENT 05/03/2000 08:00 AM To: Michel Nelson/ET&S/Enron@ENRON, John R Keller/OTS/Enron@Enron, Ray Smith/ET&S/Enron@ENRON, Lorraine Lindberg/ET&S/Enron@ENRON, Arnold L Eisenstein/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT, Steven Harris/ET&S/Enron@ENRON, James Pfeffer/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT, Rich Jolly/ET&S/Enron@ENRON, Jeffery Fawcett/ET&S/Enron@ENRON, Rich Plachy/Enron Communications@Enron Communications, David Roensch/ET&S/Enron@ENRON, Team Gallup/ET&S/Enron@ENRON, Ronald Matthews/ET&S/Enron@ENRON, Earl Chanley/ET&S/Enron@Enron, Vera Jones/ET&S/Enron@ENRON, Brian H Mellon/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT, John G Keller@EES, Phil Lowry@ENRON, Darrell Schoolcraft@ENRON, Susan Scott@ENRON, Kevin Hyatt@ENRON cc: Subject: Gallup - Status Update, May 4, AM The suction strainer was removed last night. The piping spool was reinstalled without the major compressor alignment problems that were expected. This significantly reduced the downtime necessary for the removal of the suction strainer. No major foreign materials were found in the strainer. Some small weld beads were found. There were some signs that the strainer may have been vibrating. Several compressor test runs were made early this AM to measure the vibration levels without the suction strainer. The high frequency vibration was reduced to safe levels. There is no longer any risk to the unit piping integrity. The compressor bearing vibration did not decrease due to the removal of the strainer. Rolls will continue to assess the collected vibration data to determine the cause of the high drive end bearing vibration and construct a game plan. The station once again became available for service around 4 AM. The compressor may or may not be run dependent on need. Gallup Ops and Gas Control are in close contact. The station will be manned if the compressor is running due to Gas Control being unable to send remote setpoints to the station controller. The problem stems from OPTO-22 not supporting the particular Modbus function required to send setpoints. This is a +lack of functionality, in the new LCM4 version controllers/software utilized on the Gallup Project. EECC has been in contact with OPTO-22 to determine the time table for resolving this problem. EECC, TW Ops are working on a temporary fix to enable Gas Control to send remote setpoints to Gallup. Gas Control is currently able to monitor data from Gallup. Some instrumentation will be replaced today that failed due to the high vibration over the fast few days. Final tuning of the station control loops and surge control will be also be conducted today. James Pfeffer