12 May 2000, 14:40 UTC
well head
- From
- Tom Acton tom.acton@enron.com
- Date
- Fri, 12 May 2000 07:40:00 -0700 (PDT)
Shoreline wants to move the volume of two meters. The first one, 6886 from 153 to 1 and 6501 from 46 to 1. 6501 is due to force majeure pipeline s/i on 5/10 per there sheet.