29 Mar 2001, 16:05 UTC
SPP PROPOSED TRANSMISSION LINES
- From
- Christopher Watts christopher.watts@enron.com
- To
- Richard Hrabal, Cyril Price, John Kinser, Kayne Coulter, Rudy Acevedo, Don Baughman Jr., Joe Errigo, Juan Hernandez, Dean Laurent, Keller Mayeaux, Doug Miller, Chad Starnes
- Date
- Thu, 29 Mar 2001 08:05:00 -0800 (PST)
The sender added no text of their own; everything below is quoted or forwarded.
Quoted or forwarded from earlier messages
---------------------- Forwarded by Christopher Watts/NA/Enron on 03/29/2001
04:04 PM ---------------------------
"Chris Watts" <cwatts3@houston.rr.com> on 03/29/2001 01:55:28 PM
To: <christopher.watts@enron.com>
cc:
Subject: SPP PROPOSED TRANSMISSION LINES
DJ Southwest Power Pool To Study 6 New Transmission Lines
Copyright , 2001 Dow Jones & Company, Inc.
HOUSTON (Dow Jones)--A working group within the Southwest Power Pool
identified six new transmission lines with an estimated price tag of $240
million needed to ease the region's constrained high-voltage grid.
Last week, the SPP work group voted to proceed with a more detailed
analysis of each project. Most of the new lines would take at least three
years to develop and build.
The projects include:
- A 60-mile, 345-kilovolt line in northern Missouri running from the
Fairhope substation to Sibley substation. Cost: $22.2 million.
- A 30-mile, 345-kv line in eastern Kansas running from Wolf Creek
Nuclear Power Station to the Lang substation. Cost: $23.8 million.
- A 32-mile, 345-kv line in northern Oklahoma running from the Sooner
Power Station to the Cleveland substation. Cost: $23.8 million.
- A 275-mile, 345-kv line in northern Texas and central Oklahoma
connecting the Potter substation to Northwest substation. Cost: $79.2
million.
- A 50-mile, 230-kv line in southern Louisiana running from Cajun Power
Station to Coughlin Power Station. Cost: $37.4 million.
- A 70-mile, 345-kv line in northern Arkansas running from St. Francis
Power station to Independence Power Station Cost: $57.3 million.
SPP's transmission assessment working group has been meeting to identify
needed system upgrades since March 2000.
A total of 23 known system constraints were analyzed. Seventeen upgrade
options were studied for their potential to benefit bulk system transfer
capability.
The working group identified the six new transmission lines as the most
beneficial, officials said.
Detailed analysis of each new line and further recommendations will be
made to the SPP engineering and operating committeein the fall.
Currently, SPP has some 50,000 miles of transmission lines and requests
more than 11,000 megawatts of new generation to be constructed during the
next three years in the eight-state region, said SPP President John
Marschewski.
"As a result, there will be a need for new transmission lines," he said.
SPP, which seeks to gain final approval of its regional transmission
organization this week from federal regulators, is ready to move forward to
coordinate the planning process for new transmission, said Marschewski.
The SPP grid is often paralyzed by transmission-line relief requests
from utilities, particularly in the spring when seasonal generation outages
occur, said Marschewski.
While the regional council has attempted to put incentives in the market
to encourage generation redispatch to avoid TLR events, "those options
haven't been exercised to any significant amount so far," said Marschewski.
SPP has worked to coordinate generation outages to minimize problems,
but if the region sees plant outages this summer, TLR events could occur, he
said.
SPP includes Kansas and Oklahoma and parts of Arkansas, Louisiana, New
Mexico, Mississippi, Missouri and Texas.
-By Eileen O'Grady, Dow Jones Newswires; 713-547-9213;
mailto:eileen.ogrady@dowjones.com
(END) Dow Jones Newswires 27-03-01
1605GMT
Enron
Analyst, East Power Desk
1400 Smith St.
Houston, TX 77002-7361
ph: 713-853-4292
christopher.watts@enron.com
fax: 713-345-7384