2 Jan 2001, 09:59 UTC
Skagerrak/D-G border
- From
- Mark Schroeder mark.schroeder@enron.com
- Date
- Tue, 2 Jan 2001 01:59:00 -0800 (PST)
Just to let you know that this is further (and final) fruit of Philip Davies's efforts over the past 18 months. The 1000 MW of capacity in the Skaggerak cable (running between Norway and Denmark) is now available daily to Nord Pool, via a transparent auction process. This is something our traders wanted (Thor Lien and Gregor Baumerich), and is something that Enron should be able to take advantage of, over others, given our activity in both Nord Pool, and on the Continent. Philip has been virtually alone for most of this time in advocating this, and had only limited support from elsewhere in industry and government lately. A regulatory "win" for Enron, for those keeping score. mcs
Quoted or forwarded from earlier messages
---------------------- Forwarded by Mark Schroeder/LON/ECT on 02/01/2001 09:58 --------------------------- Philip Davies 02/01/2001 08:57 To: Thorstein Jenssen, Peter Larsen, Thomas van Gilst/LON/ECT@ECT, Gregor Baumerich/LON/ECT@ECT, Ulf Ek/LON/ECT@ECT, Heribert Kresse/FRA/ECT@ECT cc: Paul Hennemeyer/LON/ECT@ECT, Mark Schroeder, Peter Styles/LON/ECT@ECT Subject: Skagerrak/D-G border Confirmation that Skagerrak capacity is available to NP now and that the extra 400 MW on the Danish/German border is available now for allocation through the daily auction. Peter -the conditional prioritisation for Skagerrak trade looks like an attempt to meet the trade distortion concerns (due to border tariffs affecting Swedish but not Norwegian trade into W. Dk) that you raised. Does it satisfactorily do the job? Thomas, please look into this with Peter. Changes affecting Elspot trade with Denmark Skagerrak Nord Pool,s Participant Information bulletin no. 31-2000 presented the cooperation between Statnett and Eltra aimed at opening the Skagerrak cables (connecting Norway and western Denmark) for power market trade via Nord Pool, s spot market. The Norwegian Parliament has passed a decision that allows for cable capacity to be made available for such purposes, beginning 1 January 2001. As of that date, the border tariff on power transported via the cables will be set at zero. Sweden - Denmark Nord Pool,s Participant Information bulletin no. 28-2000 presented Svenska Kraftn,t,s proposal to Swedish government recommending the removal of border tariffs on electric power trade between Sweden and Denmark beginning 1 January 2001. Nord Pool has been informed that the Swedish government will not make any decision in this matter before year end 2000. Denmark - Germany via Eltra - E.ON Netz The existing transit agreement for power transport via Eltra,s transmission grid will be removed as of 1 January 2001. With the removal of transit reservations, the capacity available for capacity auctions on the Germany-Denmark border will increase by nearly 400 MW. In January, this capacity will be distributed through daily auctions (the auction for the month of January has been held). The distribution according to daily and monthly auctions for the ensuing months is decided by Eltra and E.ON Netz. Framework for Elspot trade Based on the above information, the following applies to power trade with Denmark, as of 1 January 2001: The Skagerrak cables are open to trade free of border tariffs. Konti-Skan cables (connecting Sweden and western Denmark) are open to Elspot trade; border tariffs remain as today. The _resund interconnection (Sweden and eastern Denmark) is open, with border tariffs as today. A &ramping8 factor will be introduced. This means that the maximum combined change in flow on the Konti-Skan and Skagerrak cables may not exceed 600 MW between any two hours. Because power transported via the Skagerrak cables is not subject to border tariffs, while border tariffs are levied on the Konti-Skan interconnection, Nord Pool will prioritize trade via Skagerrak above Konti-Skan trade, in order to lower costs for Denmark West participants when market prices in Norway and Sweden are identical. Nord Pool is very pleased that access to the Skagerrak interconnection has been made available for all market participants.