8 Nov 2000, 12:06 UTC
EOG - Gas Lift Delivery, Eddy County-Crawford Lateral
- From
- Eric Faucheaux eric.faucheaux@enron.com
- Cc
- team.carlsbad@enron.com, Rich Jolly, terry.galassini@enron.com, Perry Frazier, Ronald Matthews, Earl Chanley, Darrell Schoolcraft
- Bcc
- team.carlsbad@enron.com, Rich Jolly, terry.galassini@enron.com, Perry Frazier, Ronald Matthews, Earl Chanley, Darrell Schoolcraft
- Date
- Wed, 8 Nov 2000 04:06:00 -0800 (PST)
Regarding the subject proposed interconnect, where EOG desires to receive 2 MMcfd from TW's 16" Crawford lateral, the available connection available is a 4" side valve (formerly used for Highland - Pecos Irrigation, POI # 500269; Sect. 10, T23S-R28E, Eddy Co., New Mexico Higland-Pecos Irrigation). The former measuring facilities, the lateral, and the 8" Crawford lateral were all sold to Duke. TW measurement facilities do not exist at the interconnect that can be re-activated for EOG gas lift measurement/regulation. Should EOG desire to receive lift gas from TW, then new measuring and regulating facilities will be required. See Figure 1 below for connection details. However, expected operating pressures available on the 16" Crawford lateral is common to suction pressures observed at the suction of WT-1 Compressor Station that varies between 580 - 630 psig (see Figure 2, daily average pressure graph for May-Oct 2000). As you indicated that EOG's line pressure would be near 650 psig, it will not be possible for TW to deliver into EOG unless they can lower their line pressure to about 550 psig or add compression. If feasibility exists for EOG to add compression and you would like for me to proceed with providing a Level "A" cost estimate for measuring/regulating facilities, please reply or give me a call. Eric - 713/853-3395 Figure 1: Connection Details for former Highland-Pecos Irrigation Co. Figure 2: Average Daily Pressure, WT-1 Suction