Enron email

Algorithmic Indexing

23 May 2001, 20:22 UTC

MHI Ref. TGOKN-0523B: Ft. Pierce Project ( Gas Turbine related data SUBJ.: Ash Content in Fuel Oil

From
Frank Hosak frank.hosak@enron.com
To
V. Charles Weldon
Date
Wed, 23 May 2001 13:22:48 -0700 (PDT)

The sender added no text of their own; everything below is quoted or forwarded.

Quoted or forwarded from earlier messages
---------------------- Forwarded by Frank Hosak/ENRON_DEVELOPMENT on 05/23/2001 03:21 PM ---------------------------
   

	Enron Engineering & Construction Company From:  Frank Hosak                           05/23/2001 09:51 AM	
		


To:	V Charles Weldon/HOU/ECT@ECT, Matthew Tezyk/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT
cc:	Bill Fox/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT, Ray McPhail/ENRON_DEVELOPMENT@ENRON_DEVELOPMENT (bcc: Frank Hosak/ENRON_DEVELOPMENT)

Subject:	MHI Ref. TGOKN-0523B: Ft. Pierce Project ( Gas Turbine related	 data 
 SUBJ.: Ash Content in Fuel Oil

Gentlemen, the attached MHI response #2 provides their answer to the Enron question of the maximum allowable ash content in the fuel oil supply.

At this stage we will have to assume that this is definitely their final answer to the ash content issue.

Thanks,
Frank
---------------------- Forwarded by Frank Hosak/ENRON_DEVELOPMENT on 05/23/2001 09:41 AM ---------------------------


<F880005@e.tmw.mhi.co.jp> on 05/23/2001 08:39:49 AM
To:	"Coleman, Mike" <Mike.Coleman@ENRON.com>, bwiggs@enron.com
cc:	F952047@e.tmw.mhi.co.jp, F852031@e.tmw.mhi.co.jp, F752038@e.tmw.mhi.co.jp, katsumi_kojiri@mhiahq.com, Q19952@hq.mhi.co.jp, Q15643@hq.mhi.co.jp, Q19283@hq.mhi.co.jp, Q15458@hq.mhi.co.jp, "Tapscott, Ron" <Ron.Tapscott@ENRON.com>, "Fox, Bill" <Bill.Fox@ENRON.com>, "Stovall, Darrell" <Darrell.Stovall@ENRON.com>, "Gimble, Mathew" <Mathew.Gimble@ENRON.com>, "Hosak, Frank" <Frank.Hosak@ENRON.com>, F922025@e.tmw.mhi.co.jp, F962059@e.tmw.mhi.co.jp, FX90806@e.tmw.mhi.co.jp, akimasa_muyama@mhiahq.com, F882032@e.tmw.mhi.co.jp, F862012@e.tmw.mhi.co.jp, F932078@e.tmw.mhi.co.jp 

Subject:	MHI Ref. TGOKN-0523B: Ft. Pierece Project ( Gas Turbine related	 data )





Messrs. Frank Hosak/ Mike Coleman/ Bill Fox, Enron

     From K. Nagamori, MHI Takasago on May 23, 2001

1. Enron FPRP-EEOS-MHI-0009
   Gas Turbine Process Temp. & Start-up Curves
  (1) Min./Max. temp. of water for NOx control
  (MHI Response)
  As shown in our Utility Consumption List for RioGen project (S4-70027
  R-1),
  Min. is 9 deg.C and Max. is 43.9 deg.C at 5.5 barg.

  (2) Min. temp rotor air cooled to
  (MHI Response)
  We will submit them at the detailed engineering stage.

  (3) Curve for GT exhaust temp. vs. GT start-up
  (MHI Response)
  We will submit it by May 25.

  (4) Curve for Rotor air temp. vs. GT start-up
  (MHI Response)
  We could not submit these data because they are proprietary data.

2. Enron FPRP-EEOS-MHI-0016
   Max. Allowable Limit for Fuel Oil Ash Content
  (MHI Response)
  Max. allowable limit for PM-10 front-half guarantee of 10mg/Nm3 at GT
  100% load on oil firing are as follows:
  Ash content (10% residuum basis)            0.1%
  Ramsbottom Carbon Residue (10% residuum basis)   0.15%

3. Revised performance & emission sheet which will be attached in EXHIBIT
A-2
  (MHI Response)
  Please refer to attached data sheet. (File "M501F Permit data r5.xls")

4. Longer term degradation curve for performance (Enron e-mail of 4/26 )
  (MHI Response)
  Please refer to attached performance deterioration curves from
  initial ignition to 48000EOH, through first major overhaul. (File
  "e00-01172.tif")
  This is for your reference and not on guarantee basis.

Best Regards
(See attached file: M501F Permit Data r5.xls)(See attached file:
e00-01172.tif)

 - M501F Permit Data r5.xls 
 - e00-01172.tif