18 Jan 2002, 01:42 UTC
(no subject)
- From
- Pete Davis pete.davis@enron.com
- To
- Pete Davis
- Date
- Thu, 17 Jan 2002 17:42:25 -0800 (PST)
No ancillary schedules awarded. Variances detected.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> H:\Netco Finals\HA0116 Finals_Load.txt
---- Load Schedule ----
$$$ Variance found in table LOAD_SCHEDULE.
Details: (Hour: 1 / Preferred: 2 / Final: 1.5)
TRANS_TYPE: FINAL
MKT_TYPE: HA
FROM_LOCATION_ID: PGE1