W E E K E N D S Y S T E M S A V A I L A B I L I T Y
F O R
April 6, 2001 5:00pm through April 9, 2001 12:00am
------------------------------------------------------------------------------
------------------------
SCHEDULED SYSTEM OUTAGES:
ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
AZURIX: No Scheduled Outages.
EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
EDI SERVER: No Scheduled Outages.
ENRON NORTH AMERICAN LANS: No Scheduled Outages.
FIELD SERVICES: No Scheduled Outages.
INTERNET:
Impact: ENS
Time: Fri 4/6/2001 at 5:30:00 PM CT thru Fri 4/6/2001 at 6:00:00 PM CT
Fri 4/6/2001 at 3:30:00 PM PT thru Fri 4/6/2001 at 4:00:00 PM PT
Fri 4/6/2001 at 11:30:00 PM London thru Sat 4/7/2001 at 12:00:00 AM London
Outage: Announce RP for EOL development network
Environments Impacted: EOL
Purpose: This is part of the multicast redesign and will limit the dense mode
multicast flooding to the EOL development network.
Backout: remove the filters
Contact(s): Scott Shishido 713-853-9780
MESSAGING:
Impact: EI
Time: Fri 4/6/2001 at 9:00:00 PM CT thru Sat 4/7/2001 at 1:00:00 AM CT
Fri 4/6/2001 at 7:00:00 PM PT thru Fri 4/6/2001 at 11:00:00 PM PT
Sat 4/7/2001 at 3:00:00 AM London thru Sat 4/7/2001 at 7:00:00 AM London
Outage: EI Notes Server Maintenance
Environments Impacted: EI Local/Domestic/Foreign Sites
Purpose: Scheduled @ 2 week interval
Backout: N/A
Contact(s): David Ricafrente 713-646-7741
Impact: Corp Notes
Time: Fri 4/6/2001 at 9:00:00 PM CT thru Sat 4/7/2001 at 1:00:00 AM CT
Fri 4/6/2001 at 7:00:00 PM PT thru Fri 4/6/2001 at 11:00:00 PM PT
Sat 4/7/2001 at 3:00:00 AM London thru Sat 4/7/2001 at 7:00:00 AM London
Outage: cNotes Server Reboots
Environments Impacted: All users on any of the mailservers listed below
Purpose: Scheduled @ 2 week interval
Backout: Make sure server comes up.
Contact(s): Trey Rhodes (713) 345-7792
Impact: Corp Exchange/Outlook
Time: Sat 4/7/2001 at 7:00:00 AM CT thru Sat 4/7/2001 at 8:00:00 AM CT
Sat 4/7/2001 at 5:00:00 AM PT thru Sat 4/7/2001 at 6:00:00 AM PT
Sat 4/7/2001 at 1:00:00 PM London thru Sat 4/7/2001 at 2:00:00 PM London
Outage: Decommission nahou-msmbx02v
Environments Impacted: Corp Exchange/Outlook
Purpose:
Backout: NA
Contact(s): Dalak Malik 713-345-8219
Scott Albroght 713-345-9381
MARKET DATA: No Scheduled Outages.
NT: No Scheduled Outages.
OS/2: No Scheduled Outages.
OTHER SYSTEMS:
Impact: CORP
Time: Sat 4/7/2001 at 8:00:00 AM CT thru Sat 4/7/2001 at 12:00:00 PM CT
Sat 4/7/2001 at 6:00:00 AM PT thru Sat 4/7/2001 at 10:00:00 AM PT
Sat 4/7/2001 at 2:00:00 PM London thru Sat 4/7/2001 at 6:00:00 PM London
Outage: Firmware Upgrade on HR Compaq EMA12000
Environments Impacted: All
Purpose: Issues with EMA12000 connectivity to SUN Servers
Backout:
Contact(s): Brandon Bangerter 713-345-4904
Raj Perubhatla 713-345-8016 281-788-9307
Brian Ellis 713-345-8017 713-446-6193
Impact: CORP
Time: Fri 4/6/2001 at 5:00:00 PM CT thru Fri 4/6/2001 at 6:00:00 PM CT
Fri 4/6/2001 at 3:00:00 PM PT thru Fri 4/6/2001 at 4:00:00 PM PT
Fri 4/6/2001 at 11:00:00 PM London thru Sat 4/7/2001 at 12:00:00 AM London
Outage: HR Global Applications Update
Environments Impacted: All
Purpose: HR Global application websites need to be updated.
Backout:
Contact(s): Brandon Bangerter 713-345-4904
Brian Ellis 713-345-5017 713-446-6193
Raj Perubhatla 713-345-5016 281-788-9307
Impact: CORP
Time: Sun 4/8/2001 at 9:00:00 AM CT thru Sun 4/8/2001 at 10:00:00 AM CT
Sun 4/8/2001 at 7:00:00 AM PT thru Sun 4/8/2001 at 8:00:00 AM PT
Sun 4/8/2001 at 3:00:00 PM London thru Sun 4/8/2001 at 4:00:00 PM London
Outage: General maintenance for server yoda (ssp for E10K deathstar).
Environments Impacted: Users of skywalker and Chewbacca. ERMS/TAGG could
potentially be impacted.
Purpose: Upgrade the patches for the SSP to E10K Deathstar.
Backout: backout the pacth and reboot
Contact(s): Malcolm Wells 713-345-3716
Impact: CORP
Time: Sun 4/8/2001 at 10:00:00 AM CT thru Sun 4/8/2001 at 11:00:00 AM CT
Sun 4/8/2001 at 8:00:00 AM PT thru Sun 4/8/2001 at 9:00:00 AM PT
Sun 4/8/2001 at 4:00:00 PM London thru Sun 4/8/2001 at 5:00:00 PM London
Outage: Patch maintenance for SSP server corona.
Environments Impacted: SSP server corona.
Purpose: General maintenance and patch upgrades needed for SSP corona.
Backout: backout the patches and reboot
Contact(s): Malcolm Wells 713-345-3716
Impact: CORP
Time: Sat 4/7/2001 at 9:00:00 PM CT thru Sat 4/7/2001 at 11:00:00 PM CT
Sat 4/7/2001 at 7:00:00 PM PT thru Sat 4/7/2001 at 9:00:00 PM PT
Sun 4/8/2001 at 3:00:00 AM London thru Sun 4/8/2001 at 5:00:00 AM London
Outage: Cpu replacement for server adcupkilo.
Environments Impacted: SAP
Purpose: Needed maintenance.
Backout: Reboot the server without CPU if necessary.
Contact(s): Malcolm Wells 713-345-3716
Impact: CORP
Time: Fri 4/6/2001 at 7:00:00 PM CT thru Fri 4/6/2001 at 9:00:00 PM CT
Fri 4/6/2001 at 5:00:00 PM PT thru Fri 4/6/2001 at 7:00:00 PM PT
Sat 4/7/2001 at 1:00:00 AM London thru Sat 4/7/2001 at 3:00:00 AM London
Outage: Sendmail upgrade on mailserver postmaster.
Environments Impacted: Corporate mail
Purpose: Upgrade sendmail on the corporate mail server to apply additional
security.
Backout: regress back to the original sendmail version.
Contact(s): Malcolm Wells 713-345-3716
SITARA: No Scheduled Outages.
SUN/OSS SYSTEM: No Scheduled Outages.
TELEPHONY:
Impact:
Time: Sat 4/7/2001 at 10:30:00 PM CT thru Sun 4/8/2001 at 12:30:00 AM CT
Sat 4/7/2001 at 8:30:00 PM PT thru Sat 4/7/2001 at 10:30:00 PM PT
Sun 4/8/2001 at 4:30:00 AM London thru Sun 4/8/2001 at 6:30:00 AM London
Outage: Emergency Maintenance - CMS Server
Environments Impacted:
Purpose: Emergency re-boot.
Backout:
Contact(s): Cynthia Siniard 713-853-0558
TERMINAL SERVER: No Scheduled Outages.
UNIFY: No Scheduled Outages.
SCHEDULED SYSTEM OUTAGES: CALGARY
Impact: CORP
Time: Fri 4/6/2001 at 9:00:00 PM Calgary thru Sat 4/7/2001 at 9:00:00 PM
Calgary
Fri 4/6/2001 at 10:00:00 PM CT thru Sat 4/7/2001 at 10:00:00 PM CT
Fri 4/6/2001 at 8:00:00 PM PT thru Sat 4/7/2001 at 8:00:00 PM PT
Sat 4/7/2001 at 4:00:00 AM london thru Sun 4/8/2001 at 4:00:00 AM London
Outage: Calgary Power Outage
Environments Impacted: Corp Calgary
Purpose: The building is having their annual power outage for maintenance.
Backout:
- Complete backup of the servers before shutdown
- Spare disks in case of multiple failures
- Open tickets with telcos in case the circuits don't come back on line
- Telco to assist with shutdown and power up of PBX and IPC
Contact(s): Dan Dietrich 713-345-8836
Todd Bowen 403-974-6951
Clayton Rondeau 403-974-6904
------------------------------------------------------------------------------
-------------------------------------------------------
FOR ASSISTANCE
(713) 853-1411 Enron Resolution Center
Specific Help:
Information Risk Management (713) 853-5536
SAP/ISC
(713) 345-4727
Unify On-Call (713) 284-3757 [Pager]
Sitara On-Call (713) 288-0101 [Pager]
RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager]
OSS/UA4/TARP (713) 285-3165 [Pager]
CPR (713) 284-4175 [Pager]
EDI Support (713) 327-3893 [Pager]
EES Help Desk (713)853-9797 OR (888)853-9797