25 Oct 2000, 10:05 UTC
Purchase order
- From
- Scott Healy scott.healy@enron.com
- To
- Kay Mann
- Bcc
- Stephen Plauche
- Date
- Wed, 25 Oct 2000 03:05:00 -0700 (PDT)
I will send you comments via e-mail periodically as I read sections. Here are my comments thru Section 5. 1. Shouldn't the agreement be in the name of ENA? 2. Section 2.1--We should have the right to change the persons identified listed in Section 2.1 (a) & (b), particularly if we assign. Do we need a procedure? 3. Section 2.1 (d)--Shouldn't it just say "highway" as opposed to "major highway"? 4. Section 2--Need to add the following concept. 90 days after RTO, Purchaser shall identify up to [5] primary or alternative sites for installation of the units (identification to include an expected configuration). Upon 10 day notice, Purchaser shall have the right to substitute sites or change site configurations. The project plans shall be based on the primary configurations identified by Purchaser. 4 months prior to shipment, Purchaser must identify the site where a unit must go. At this point, the site is locked in for that unit. 5. Section 3.3 (c)--insert "or as reasonably required to implement" after "as required by". 6. Section 3.16--Add in concept of identified sites. Timing of plans should coincide with site identification. 7. Section 5.1.1--Incorprate concept that shipping per unit is based on the lesser of actual costs or $87,000 per unit. I think that FCE agreed to this concept. 8. Section 5.4--Why is "to be discussed" shown? I thought that FCE agreed.