23 Feb 2001, 12:07 UTC
GridFlorida's response to EPMI request for real time market
- From
- Christi L Nicolay christi.nicolay@enron.com
- To
-
Jeff Brown, Ron McNamara, James D Steffes, Sarah Novosel, Aleck Dadson, Daniel Allegretti, Howard Fromer, Joe Hartsoe, Donna Fulton, Tom Hoatson, Steve Montovano, Robin Kittel
and 32 more
Jean Ryall, Tom Chapman, Janine Migden, Dave Mangskau, Dan Staines, mike.roan@enron.com, Joe Connor, Kerry Stroup, Steve Walton, Mary Hain, Alan Comnes, Susan J Mara, Thane Twiggs, Rogers Herndon, Kevin M Presto, Ozzie Pagan, Heather Kroll, David Fairley, George McCormick, wjennin@enron.com, Joseph Wagner, Elizabeth Johnston, Bill Rust, Reagan Rorschach, Edith Cross, berney.aucoin@enron.com, Shelley Corman, John M Forney, Fletcher J Sturm, Laura Podurgiel, Richard Shapiro, Steven J Kean - Date
- Fri, 23 Feb 2001 04:07:00 -0800 (PST)
FPC, FPL and TECO filed a lengthy response to all the protests of its amended filing. Recall that EPMI filed a protest asking GridFlorida to implement a real time energy market and remove the day ahead balanced schedule requirement. Dan Staines and Mike Roan are doing a good job because rather than replying that the real time energy market is a bad idea, the GridFlorida utilities responded that they are not necessarily opposed as a theoretical matter, there were some practical considerations that led them not to include such a market in their proposal, including "(1) concerns that unbalanced schedules will not work without either some form of forward market or a centralized unit commitment process; (2) concerns that GridFlorida be able to demonstrate the ability to administer a market with balanced schedules before considering unbalanced schedules; and (3) concerns about the impact of market power in the region on the larger real-time energy market that would result from unbalanced schedules." Grid Florida then stresses that the decision to require balanced schedules is not necessarily meant to be permanent and the ability to submit unbalanced schedules, if not raised sooner, would be an issue for further consideration in the report on market design due within 18 months after commencement and that GridFlorida has complete freedom to propose changes to its tariff, which it could do at anytime (through the Advisory Committee.) Lynette Barnes has a copy of the complete filing.