22 Apr 2001, 11:41 UTC
Start Date: 4/22/01; HourAhead hour: 12; <CODESITE>
- From
- Schedule Crawler pete.davis@enron.com
- To
- Pete Davis
- Cc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
and 1 more
Steven Merris - Bcc
-
Bert Meyers, bill.williams.iii@enron.com, Craig Dean, dporter3@enron.com, Eric Linder, Geir Solberg, jbryson@enron.com, Leaf Harasin, Monika Causholli, Mark Guzman, Pete Davis, Ryan Slinger
and 1 more
Steven Merris - Date
- Sun, 22 Apr 2001 04:41:00 -0700 (PDT)
Start Date: 4/22/01; HourAhead hour: 12; No ancillary schedules awarded.
Variances detected.
Variances detected in Energy Import/Export schedule.
Variances detected in SC Trades schedule.
Variances detected in Load schedule.
LOG MESSAGES:
PARSING FILE -->> O:\Portland\WestDesk\California Scheduling\ISO Final
Schedules\2001042212.txt
---- Energy Import/Export Schedule ----
$$$ Variance found in table tblINTCHG_IMPEXP.
Details: (Hour: 12 / Preferred: 12.00 / Final: 11.98)
TRANS_TYPE: FINAL
SC_ID: ECTRT
MKT_TYPE: 2
TRANS_DATE: 4/22/01
TIE_POINT: PVERDE_5_DEVERS
INTERCHG_ID: EPMI_CISO_ERNIE
ENGY_TYPE: WHEEL
---- SC Trades Schedule ----
*** Final schedule not found for preferred schedule.
Details:
TRANS_TYPE: FINAL
SC_ID: EPMI
MKT_TYPE: 2
TRANS_DATE: 4/22/01
TRADING_SC: CRLP
PNT_OF_INTRC: SP15
SCHED_TYPE: ENGY
PURCH_SALE: 1
DEAL_NO: 1
$$$ Variance found in table tblInt_Interchange.
Details: (Hour: 12 / Preferred: -100.00 / Final: -99.97)
TRANS_TYPE: FINAL
SC_ID: EPMI
MKT_TYPE: 2
TRANS_DATE: 4/22/01
TRADING_SC: EPPS
PNT_OF_INTRC: NP15
SCHED_TYPE: ENGY
PURCH_SALE: 1
DEAL_NO: 1
---- Load Schedule ----
$$$ Variance found in table tblLoads.
Details: (Hour: 12 / Preferred: 64.64 / Final: 64.59)
TRANS_TYPE: FINAL
LOAD_ID: PGE3
MKT_TYPE: 2
TRANS_DATE: 4/22/01
SC_ID: EPMI