16 Aug 2001, 21:36 UTC
Weekend Outage Report for 8-17-01 through 8-20-01
- From
- Enron Change Management Announcement@ENRON no.address@enron.com
- Date
- Thu, 16 Aug 2001 14:36:03 -0700 (PDT)
------------------------------------------------------------------------------------------------------
W E E K E N D S Y S T E M S A V A I L A B I L I T Y
F O R
August 17, 2001 5:00pm through August 20, 2001 12:00am
------------------------------------------------------------------------------------------------------
SCHEDULED SYSTEM OUTAGES: NA
ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
AZURIX: No Scheduled Outages.
EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.
EDI SERVER: No Scheduled Outages.
ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages
ENRON NORTH AMERICAN LANS:
Impact: ECN 4
Time: Sat 8/18/2001 at 12:00:00 PM CT thru Sat 8/18/2001 at 4:00:00 PM CT
Sat 8/18/2001 at 10:00:00 AM PT thru Sat 8/18/2001 at 2:00:00 PM PT
Sat 8/18/2001 at 6:00:00 PM London thru Sat 8/18/2001 at 10:00:00 PM London
Outage: Swtich Replacement
Environments Impacted: Groups on floors listed
Purpose: 2820's are 10/half switches. 2924's are 10/100, half/full
Backout:
Contact(s): Mark Trevino 713-345-9954
Impact: CORP
Time: Sat 8/18/2001 at 9:00:00 AM CT thru Sat 8/18/2001 at 12:00:00 PM CT
Sat 8/18/2001 at 7:00:00 AM PT thru Sat 8/18/2001 at 10:00:00 AM PT
Sat 8/18/2001 at 3:00:00 PM London thru Sat 8/18/2001 at 6:00:00 PM London
Outage: Swap Cisco 2924 switches for Cisco 2948 switches on ECN31
Environments Impacted: Corp
Purpose: 1) Should improve performance (2924 backplane is 3.2 Gbps, and 2948 backplane is 24 Gbps)
2) Switches will occupy less real estate in the wiring closet
Backout: Disconnect 2948's and re-connect the 2924's
Contact(s): Gail Kettenbrink 713-853-4524
Impact: CORP
Time: Sat 8/18/2001 at 12:00:00 AM CT thru Sat 8/18/2001 at 1:00:00 AM CT
Fri 8/17/2001 at 10:00:00 PM PT thru Fri 8/17/2001 at 11:00:00 PM PT
Sat 8/18/2001 at 6:00:00 AM London thru Sat 8/18/2001 at 7:00:00 AM London
Outage: Increase bandwidth on the network core
Environments Impacted: All
Purpose: When users are moved to the new building the traffic on the core will increase significantly.
Backout: revert back to the one link
Contact(s): Christopher M Ducker 713-345-8241
FIELD SERVICES: No Scheduled Outages.
INTERNET:
Impact: Internet
Time: Fri 8/17/2001 at 10:30:00 PM CT thru Sat 8/18/2001 at 12:30:00 AM CT
Fri 8/17/2001 at 8:30:00 PM PT thru Fri 8/17/2001 at 10:30:00 PM PT
Sat 8/18/2001 at 4:30:00 AM London thru Sat 8/18/2001 at 6:30:00 AM London
Outage: Upgrade Enron.com infrastructure
Environments Impacted: Internet
Purpose: Standardization and address high peak Internet utilization.
Backout: Replace with old circuit, router, and switches.
Contact(s): John Shupak 713-853-7943
Impact: EOL News readers
Time: Fri 8/17/2001 at 8:00:00 PM CT thru Fri 8/17/2001 at 9:00:00 PM CT
Fri 8/17/2001 at 6:00:00 PM PT thru Fri 8/17/2001 at 7:00:00 PM PT
Sat 8/18/2001 at 2:00:00 AM London thru Sat 8/18/2001 at 3:00:00 AM London
Outage: Reconfigure News database indexes on servers EOLNEWS[1-2]
Environments Impacted: EOL
Purpose: Improve performance and reliability; especially when users is doing complex query for news story.
Eliminate transient problem with qprv exiting abruptly.
Backout: Restore original configurations
Contact(s): Rick Le 713-853-5345
MESSAGING:
Impact: Corp Notes
Time: Fri 8/17/2001 at 9:00:00 PM CT thru Sat 8/18/2001 at 1:00:00 AM CT
Fri 8/17/2001 at 7:00:00 PM PT thru Fri 8/17/2001 at 11:00:00 PM PT
Sat 8/18/2001 at 3:00:00 AM London thru Sat 8/18/2001 at 7:00:00 AM London
Outage: cNotes Server Reboots
Environments Impacted: All users on any of the mailservers listed below
Purpose: Scheduled @ 2 week interval
Backout: Make sure server comes up.
Contact(s): Trey Rhodes (713) 345-7792
Impact: EI
Time: Fri 8/17/2001 at 9:00:00 PM CT thru Sat 8/18/2001 at 1:00:00 AM CT
Fri 8/17/2001 at 7:00:00 PM PT thru Fri 8/17/2001 at 11:00:00 PM PT
Sat 8/18/2001 at 3:00:00 AM London thru Sat 8/18/2001 at 7:00:00 AM London
Outage: EI Notes Server Maintenance
Environments Impacted: EI Local/Domestic/Foreign Sites
Purpose: Scheduled @ 2 week interval
Backout: N/A
Contact(s): David Ricafrente 713-646-7741
MARKET DATA: No Scheduled Outages.
NT: No Scheduled Outages.
OS/2: No Scheduled Outages.
OTHER SYSTEMS:
Impact: Global Production Database
Time: Sat 8/18/2001 at 12:00:00 AM CT thru Sun 8/19/2001 at 2:00:00 PM CT
Fri 8/17/2001 at 10:00:00 PM PT thru Sun 8/19/2001 at 12:00:00 PM PT
Sat 8/18/2001 at 6:00:00 AM London thru Sun 8/19/2001 at 8:00:00 PM London
Outage: Global database (GDB) - Upgrade to Oracle 8i
Environments Impacted: Global Counterparty, Global Contracts, Global Facilities, and Global Commom Codes
Purpose: The Global production database will be upgraded to Oracle 8.1.7.2 database to a newer server.
Backout:
Contact(s): Global Pager 713-285-0023 or 7132850023@page.metrocall.com
Ravi Arumbakkam 713-853-5940
Fred Castrow 713-853-3252
Sundar Chitradurga 713-853-0672
Impact: CORP
Time: Sun 8/19/2001 at 3:00:00 PM CT thru Sun 8/19/2001 at 8:00:00 PM CT
Sun 8/19/2001 at 1:00:00 PM PT thru Sun 8/19/2001 at 6:00:00 PM PT
Sun 8/19/2001 at 9:00:00 PM London thru Mon 8/20/2001 at 2:00:00 AM London
Outage: DCFPROD/FAXPROD Database Server Move
Environments Impacted: ENA
Purpose: Move database to a newer server.
Backout: Startup old database. Change tnsnames.ora back.
Contact(s): Alex Hsieh 713-853-6561 713-288-1779
SITARA:
Impact: Sitara and CPR Production
Time: Fri 8/17/2001 at 11:30:00 PM CT thru Sun 8/19/2001 at 2:00:00 PM CT
Fri 8/17/2001 at 9:30:00 PM PT thru Sun 8/19/2001 at 12:00:00 PM PT
Sat 8/18/2001 at 5:30:00 AM London thru Sun 8/19/2001 at 8:00:00 PM London
Outage: Sitara/CPR
Environments Impacted: Sitara and CPR Users
Purpose: Global Database (GDB) - Upgrade to Oracle 8i.
Backout: revert back to Oracle 7.3.4
Contact(s): SitaraOnCall 713-288-0101
SUN/OSS SYSTEM: No Scheduled Outages.
TELEPHONY:
Impact: Enron Tower
Time: Sat 8/18/2001 at 6:00:00 AM CT thru Sat 8/18/2001 at 10:00:00 AM CT
Sat 8/18/2001 at 4:00:00 AM PT thru Sat 8/18/2001 at 8:00:00 AM PT
Sat 8/18/2001 at 12:00:00 PM London thru Sat 8/18/2001 at 4:00:00 PM London
Outage: Change Access Code for Tie Lines
Environments Impacted: All
Purpose: Required for Enron Building to reflect AAR standard utilized by all Enron phone systems
Backout: Revert to old access codes.
Contact(s): Rebecca Sutherland 713-345-7192
Impact:
Time: Sat 8/18/2001 at 10:00:00 PM CT thru Sun 8/19/2001 at 12:00:00 AM CT
Sat 8/18/2001 at 8:00:00 PM PT thru Sat 8/18/2001 at 10:00:00 PM PT
Sun 8/19/2001 at 4:00:00 AM London thru Sun 8/19/2001 at 6:00:00 AM London
Outage: Quarterly Maintenance - Intuity Voicemail
Environments Impacted: All
Purpose: Quarterly Maintenance
Backout: None
Contact(s): Cynthia Siniard 713-853-0558
TERMINAL SERVER: No Scheduled Outages.
UNIFY: No Scheduled Outages.
SCHEDULED SYSTEM OUTAGES: LONDON
Impact: CORP
Time: Fri 8/17/2001 at 6:00:00 PM CT thru Sat 8/18/2001 at 9:00:00 PM CT
Fri 8/17/2001 at 4:00:00 PM PT thru Sat 8/18/2001 at 7:00:00 PM PT
Sat 8/18/2001 at 12:00:00 AM London thru Sun 8/19/2001 at 3:00:00 AM London
Outage: Complete Powerdown of the London office
Environments Impacted: All
Purpose: Installation of a third generator at Enron House
Backout: Switch all equipment back on.
Contact(s): Tracy Pearson 830-34238 London Tie Line
----------------------------------------------------------------------------------------------------------------------------
FOR ASSISTANCE
(713) 853-1411 Enron Resolution Center
Specific Help:
Information Risk Management (713) 853-5536
SAP/ISC (713) 345-4727
Unify On-Call (713) 284-3757 [Pager]
Sitara On-Call (713) 288-0101 [Pager]
RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager]
OSS/UA4/TARP (713) 285-3165 [Pager]
CPR (713) 284-4175 [Pager]
EDI Support (713) 327-3893 [Pager]
EES Help Desk (713)853-9797 OR (888)853-9797
TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]