2 Nov 2000, 16:08 UTC
Re: Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project
- From
- rkbooth@attglobal.net rkbooth@attglobal.net
- Date
- Thu, 2 Nov 2000 08:08:00 -0800 (PST)
Thanks Kate, this looks like a good template. At this point, I need to spend a few minutes with Ed to discuss the scope associated with a project description.? There are a number of figures and engineering tasks that are typically required (e.g., flow diagrams, water/steam balances, site layout/location drawings, noise review, electric inter tie, emissions data, etc.). Ed: Could you give me a call on this when you have a minute? Thanks, --Bob ksymes@enron.com wrote: It looks like the entire EIS for the Hermiston Power Project is here. However, I have yet to locate anything on the Chehalis Project specifically. I have ordered hard copies of both documents from BPA and they should be here by Monday, at which point I can make copies and send them out. Please look this over and let me know if it will still be necessary to send hard copies. I will be happy to accomodate either way. Katehttp://nepa.eh.doe.gov/eis/eis0230/eis0230_toc.html First PageList Of FiguresList Of Tables Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project EIS-0230 TABLE OF CONTENTS GLOSSARY Resource Contingency Program*Oregon 1.0 INTRODUCTION 1.1 Purpose and Need 1.2 Alternatives 2.0 PROJECT DESCRIPTION *HERMISTON 2.1 Site Location 2.2 Project Components 2.3 Operating Schedule 2.4 Construction Schedule 2.5 Decommissioning 3.0 AFFECTED ENVIRONMENT *HERMISTON 3.1 Geology, Soils, and Floodplains 3.2 Water Resources 3.3 Air Quality 3.4 Noise 3.5 Vegetation and Wetlands 3.6 Wildlife and Fisheries Resources 3.7 Land Use 3.8 Cultural Resources 3.9 Socioeconomics and Public Services 3.10 Recreation Resources 3.11 Public Health and Safety 3.12 Visual Quality 4.0 ENVIRONMENTAL EFFECTS *HERMISTON 4.1 Geology, Soils and Floodplains 4.2 Water Resources 4.3 Air Quality 4.4 Noise 4.5 Vegetation/Wetlands 4.6 Wildlife and Fisheries Resources 4.7 Land Use 4.8 Cultural Resources 4.9 Socioeconomics and Public Services 4.10 Recreation Resources 4.11 Public Health and Safety 4.12 Visual Quality 5.0 ENVIRONMENTAL CONSULTATION, REVIEW, AND PERMIT REQUIREMENTS *HERMISTON 5.1 National Environmental Policy Act 5.2 Threatened and Endangered Species and Critical Habitat 5.3 Fish and Wildlife Conservation 5.4 Cultural Resource (Heritage Conservation) 5.5 State, Areawide, and Local Plan and ProgramConsistency 5.6 Coastal Zone Management Program Consistency 5.7 Floodplains 5.8 Wetlands 5.9 Farmlands 5.10 Recreation Resources 5.11 Global Warming 5.12 Permit for Structures in Navigable Waters 5.13 Permit for Discharges into Waters of the United States 5.14 Permits for Right-of-Way on Public Lands 5.15 Energy Conservation at Federal Facilities 5.16 Pollution Control 6.0 LITERATURE CITED *HERMISTON 7.0 PUBLIC COMMENTS ON THE DRAFT EIS AND RESPONSES *HERMISTON 7.1 Draft EIS Public Review Process 7.2 Draft EIS Comment Review Process 7.3 Comments and Responses 8.0 LIST OF PREPARERS 8.1 BPA EIS Team 8.2 Foster Wheeler Environmental EIS Team APPENDIX A BIOLOGICAL ASSESSMENT FOR THE *HERMISTON POWER PROJECT This file is not available electronically APPENDIX B HEALTH AND SAFETY *HERMISTON This file is not available electronically First PageList Of FiguresList Of Tables