CAISO Notification- OASIS Re-design

From
CRCommunications @ENRON crcommunications@caiso.com
To
20participants@caiso.com
Date
Mon, 25 Jun 2001 08:15:30 -0700 (PDT)


		Oasis Re-Design Notice



	This notice is being issued to the Market Participants regarding the
OASIS Re-Design Project.
Included in this notice are the following:
*	Schedule for implementation of the OASIS Re-Design site
*	Release Notes for OASIS Version 1.1
*
*
*	OASIS Release Schedule:
*
*	Monday, June 25th, 2001 - The http://oasisp.caiso.com OASIS
Re-Design site is available for the Market Participants use in parallel
processing mode. This allows for development, fault tolerant handling and
regression testing.
*	During this time, all system malfunctions which require IMMEDIATE
attention should be routed through the ISO Network Support at 1-888-889-0450
*	Please report any other issues to the OASIS team e-mail at
http://XMLWG@CAISO.COM
*	Monday, June 25th, 2001 -  Release of OASIS Version 1.1 - Please see
Release Notes below.
*	Wednesday, June 27th, 2001 - TSWG Conference Call 1:30pm PPT. Call
In Number (877) 670-4111  Passcode 246870
*	Friday, June 29th, 2001 - End of fault tolerant/regression testing
period.
*
*	Monday, July 2nd, 2001 - Begin of Market Simulation.
*	Monday, July 2nd, 2001 - Conference Call to detail Market Simulation
plan. (details to follow)
*	Tuesday, July 3rd, 2001 - Structured Fault Tolerant Testing with
conference bridge.
*	Thursday, July 5th, 2001 - Structured Fault Tolerant Testing with
conference bridge.
*	Friday, July 6th, 2001 - End of Market Simulation.
*
*	Monday, July 9th, 2001 - Release to Production
*
*
*
*	OASIS Version 1.1 -  Release Notes
*
*
*	Release Date: June 25th, 2001
*
*	These release notes provide a summary of the new features and system
enhancements that have been implemented since the last release.
*
*	Home Page
*	Added Link to Transmission Owners Forum.
*
*	Data Report Tabs
*	Forecasts - Fuel and Emissions Prices
*	Added XML download functionality
*	Added to  "F07" download group
*
*	Ex-Post - Price Mitigation Status
*	Changed name of report to Proxy Bid Utilization Status.
*	Added XML download functionality.
*	Added to "T" download group
*
*	OASIS Help
*	Under Downloading in XML,  added Fault Tolerance Considerations
document that contains recommendations for user settings to allow for best
results in a failover condition.
*	Under Downloading in XML, added Automating Data Retrievals document
that describes the suggested method to detect when new data publications
have been pushed to the OASIS site.
*
*
*
*
*	Changes Effecting Customer
*	 Automated Interface Development
*
*
*	In Maintypes.xsd, TRNS_ZONAL_CONG_PRC_DIF changed to
TRNS_ZONAL_CNGS_PRC_DIF.
*	In the Atlas - Zonal Reference Report, report name in XML changed to
ATLS_MF_ZONE_REF.
*	As indicated above, added Fuel and Emissions Prices report to the
"F07" group download.
*	As indicated above, added Proxy Bid Utilization Status report to the
"T" group download.
*
*
*	Internal System Enhancements
*
*	Modified Domain Name Server configuration to allow for improved load
balancing and enhanced fault tolerance.