6 Sep 2001, 22:00 UTC
Weekend Outage Report for 9-7-01 through 9-10-01
- From
- Enron Change Management Announcement@ENRON 40enron@enron.com
- Date
- Thu, 6 Sep 2001 15:00:59 -0700 (PDT)
------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R September 7, 2001 5:00pm through September 10, 2001 12:00am ------------------------------------------------------------------------------------------------------ SCHEDULED SYSTEM OUTAGES: NA ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: No Scheduled Outages. EES: Impact: EES Time: Fri 9/7/2001 at 7:00:00 PM CT thru Sat 9/8/2001 at 12:00:00 AM CT Fri 9/7/2001 at 5:00:00 PM PT thru Fri 9/7/2001 at 10:00:00 PM PT Sat 9/8/2001 at 1:00:00 AM London thru Sat 9/8/2001 at 6:00:00 AM London Outage: Migrate EESHOU-FS1 data to new hardware Environments Impacted: EES Purpose: Correct virus and performance issues Backout: Revert back to old server hardware, which will still contain a current copy of the data Contact(s): Hans Maverick 713-853-1741 Rusty Ratliff 713-345-3087 800-759-8888 PIN 1784107 ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: Impact: Traders Time: Sat 9/8/2001 at 12:00:00 AM CT thru Sat 9/8/2001 a 12:30:00 AM CT Fri 9/7/2001 at 10:00:00 PM PT thru Fri 9/7/2001 at 10:30:00 AM PT Sat 9/8/2001 at 6:00:00 AM London thru Sat 9/8/2001 at 6:30:00 AM London Outage: Upgrade TRD-CX11 & TRD-CX12 Environments Impacted: Traders Purpose: We need to add additional gig ports to support a new traders cluster, we have to upgrade the code on the switches to support the new gig blade Backout: Load the old version of code, reboot Contact(s): Vincent Fox 713-853-5337 Christopher M Ducker 713-345-8241 Impact: Traders Time: Sat 9/8/2001 at 12:30:00 AM CT thru Sat 9/8/2001 at 1:00:00 AM CT Fri 9/7/2001 at 10:30:00 PM PT thru Fri 9/7/2001 at 11:00:00 PM PT Sat 9/8/2001 at 6:30:00 AM London thru Sat 9/8/2001 at 7:00:00 AM London Outage: Upgrade Trader 1 and 2 switch and router code Environments Impacted: Traders Purpose: Bug in code is filling up logs Backout: Replace new cards with old cards, reboot boxes. Contact(s): Christopher M Ducker 713-345-8241 Vincent Fox 713-853-5337 Impact: CORP Time: Sat 9/8/2001 at 11:30:00 PM CT thru Sun 9/9/2001 at 12:30:00 AM CT Sat 9/8/2001 at 9:30:00 PM PT thru Sat 9/8/2001 at 10:30:00 PM PT Sun 9/9/2001 at 5:30:00 AM London thru Sun 9/9/2001 at 6:30:00 AM London Outage: Metropolitain Network Routing Turnup Environments Impacted: All Purpose: Increased bandwidth between Ardmore and ECN and ECS, increased redundancy Backout: Turn on routing Contact(s): Vincent Fox 713-853-5337 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. MESSAGING: Impact: Corp Notes Time: Fri 9/7/2001 at 9:00:00 PM CT thru Sat 9/8/2001 at 1:00:00 AM CT Fri 9/7/2001 at 7:00:00 PM PT thru Fri 9/7/2001 at 11:00:00 PM PT Sat 9/8/2001 at 3:00:00 AM London thru Sat 9/8/2001 at 7:00:00 AM London Outage: cNotes Server Reboots Environments Impacted: All users on any of the mailservers listed below Purpose: Scheduled @ 2 week interval Backout: Make sure server comes up. Contact(s): Trey Rhodes (713) 345-7792 Impact: EI Time: Fri 9/7/2001 at 9:00:00 PM CT thru Sat 9/8/2001 at 1:00:00 AM CT Fri 9/7/2001 at 7:00:00 PM PT thru Fri 9/7/2001 at 11:00:00 PM PT Sat 9/8/2001 at 3:00:00 AM London thru Sat 9/8/2001 at 7:00:00 AM London Outage: EI Notes Server Maintenance Environments Impacted: EI Local/Domestic/Foreign Sites Purpose: Scheduled @ 2 week interval Backout: N/A Contact(s): David Ricafrente 713-646-7741 MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: Impact: Enron Net Works Time: Sat 9/8/2001 at 8:00:00 AM CT thru Sat 9/8/2001 at 12:00:00 PM CT Sat 9/8/2001 at 6:00:00 AM PT thru Sat 9/8/2001 at 10:00:00 AM PT Sat 9/8/2001 at 2:00:00 PM London thru Sat 9/8/2001 at 6:00:00 PM London Outage: Move PWRPROD1 database to a new server Environments Impacted: ENpower Users Purpose: To provide better performance Backout: Existing database will be intact on Neutron, fail back is to point back to existing database Contact(s): Tantra Invedy 713 853 4304 Impact: HRWeb.enron.com Time: Fri 9/7/2001 at 6:00:00 PM CT thru Fri 9/7/2001 at 7:00:00 PM CT Fri 9/7/2001 at 4:00:00 PM PT thru Fri 9/7/2001 at 5:00:00 PM PT Sat 9/8/2001 at 12:00:00 AM London thru Sat 9/8/2001 at 1:00:00 AM London Outage: HRWeb.enron.com Update Environments Impacted: Users of HRWeb Purpose: At the request of HR. Backout: Change back to original entry HRWSTG1.corp.enron.com. Contact(s): Chris Littlejohn 713-853-4514 Impact: ETS Time: Fri 9/7/2001 at 10:00:00 PM CT thru Mon 9/17/2001 at 6:00:00 AM CT Fri 9/7/2001 at 8:00:00 PM PT thru Mon 9/17/2001 at 4:00:00 AM PT Sat 9/8/2001 at 4:00:00 AM London thru Mon 9/17/2001 at 12:00:00 PM London Outage: Migrate DSS Data to ETS SAN Environments Impacted: ETS Purpose: Current machine is being phased out. Backout: None required. Contact(s): Mary Vollmer 713-853-3381 Joe Hellsten 713-853-7346 Impact: Enron North America Time: Fri 9/7/2001 at 5:30:00 PM CT thru Sun 9/9/2001 at 1:00:00 AM CT Fri 9/7/2001 at 3:30:00 PM PT thru Sat 9/8/2001 at 11:00:00 PM PT Fri 9/7/2001 at 11:30:00 PM London thru Sun 9/9/2001 at 7:00:00 AM London Outage: Migration of the POPS Oracle Database Environments Impacted: Gas Control Purpose: The Older version will not be supported by Oracle Backout: Restore the old database Contact(s): Vijay Balakrishnan 713 853 7162 281 960 7191(cell) DBA Oncall 888 993 3793 Application On call 713 539 3340(cell) Impact: CORP Time: Sun 9/9/2001 at 10:00:00 AM CT thru Sun 9/9/2001 at 3:00:00 PM CT Sun 9/9/2001 at 8:00:00 AM PT thru Sun 9/9/2001 at 1:00:00 PM PT Sun 9/9/2001 at 4:00:00 PM London thru Sun 9/9/2001 at 9:00:00 PM London Outage: Update Houston GEM deployment share Environments Impacted: Corp Purpose: To provide greater stability and resources, the CORP Windows 2000 image will upgraded to include new and upgraded components including Windows 2000 SP2, MDAC 2.6, Internet Explorer 5.5 SP1 and several others. Backout: Replace the newer files with the original files. Contact(s): Mark Hall 713-853-3380 Impact: CORP Time: Sat 9/8/2001 at 8:00:00 AM CT thru Sat 9/8/2001 at 11:00:00 AM CT Sat 9/8/2001 at 6:00:00 AM PT thru Sat 9/8/2001 at 9:00:00 AM PT Sat 9/8/2001 at 2:00:00 PM London thru Sat 9/8/2001 at 5:00:00 PM London Outage: T-3 firmware upgrade for server spectre. Environments Impacted: Moneypenny and WSP Purpose: General maintenance needed to keep hardware up to date. Backout: Back out the new firmware code. Contact(s): Malcolm Wells 713-345-3716 SITARA: No Scheduled Outages. SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. SCHEDULED SYSTEM OUTAGES: LONDON Impact: CORP Time: Fri 9/7/2001 at 6:00:00 PM CT thru Sat 9/8/2001 at 9:00:00 PM CT Fri 9/7/2001 at 4:00:00 PM PT thru Sat 9/8/2001 at 7:00:00 PM PT Sat 9/8/2001 at 12:00:00 AM London thru Sun 9/9/2001 at 3:00:00 AM London Outage: Complete Powerdown of the London office Environments Impacted: All Purpose: Installation of a third generator at Enron House Backout: Switch all equipment back on. Contact(s): Tracy Pearson 830-34238 London Tie Line ---------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]