21 Feb 2002, 17:30 UTC
TW/ Lonestar Ward County intercoonect-----Level-A cost
- From
- Mansoor Abdmoulaie mansoor.abdmoulaie@enron.com
- Date
- Thu, 21 Feb 2002 09:30:23 -0800 (PST)
Michelle In order to make this interconnect bi-directional the following work need to be performed: ( capacity 35- 60 mmcf/d at 800-850 # pressure) 1): Blowdown gas in 5.335 miles of 12" ( gas-loss) at 1000# pressure 2): Remove a flapper in the check-valve or turn around the existing check-valve The cost for this is approximately $8,000 to $10,000. Still waiting for Earl Chanley from Roswell to send me some facility information regarding the Pecos interconnect. Mansoor