14 Sep 2001, 22:03 UTC
Supplemental Weekend Outage Report for 9-14-01 through 9-17-01
- From
- Enron Change Management Announcement@ENRON 40enron@enron.com
- Date
- Fri, 14 Sep 2001 15:03:57 -0700 (PDT)
------------------------------------------------------------------------------------------------------ W E E K E N D S Y S T E M S A V A I L A B I L I T Y F O R September 14, 2001 5:00pm through September 17, 2001 12:00am ------------------------------------------------------------------------------------------------------ SCHEDULED SYSTEM OUTAGES: NA ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. AZURIX: No Scheduled Outages. EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages. EDI SERVER: Impact: CORP POSTPONED Time: Sat 9/15/2001 at 11:00:00 PM CT thru Sun 9/16/2001 at 3:00:00 AM CT Sat 9/15/2001 at 9:00:00 PM PT thru Sun 9/16/2001 at 1:00:00 AM PT Sun 9/16/2001 at 5:00:00 AM London thru Sun 9/16/2001 at 9:00:00 AM London Outage: Upgrade EDINET Environments Impacted: Corp Purpose: Improve reliability, performance, and increase information output. Backout: 1. Switch IP DNS Entries for the Corp Domain for edinet.enron.com and ecnet.enron.com back to the original state 2. Restore database tables for edi_hub systems. 3. Switch IP DNS Entries for the Corp Domain for edinet.enron.com and ecnet.enron.com. 4. Save old code and script changes and install new code and configure new code from edi_qa. Contact(s): John Kratzer 713-345-4642 713-318-4746 Jack Metkus 713-853-0362 713-288-0743 EES: SEE ORIGINAL REPORT ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages ENRON NORTH AMERICAN LANS: ALSO SEE ORIGINAL REPORT Impact: EBS Time: Sat 9/15/2001 at 12:00:00 PM CT thru Sat 9/15/2001 at 1:00:00 PM CT Sat 9/15/2001 at 10:00:00 AM PT thru Sat 9/15/2001 at 11:00:00 AM PT Sat 9/15/2001 at 6:00:00 PM London thru Sat 9/15/2001 at 7:00:00 PM London Outage: Converting EBS to CORP Network Environments Impacted: EBS Purpose: Incorporating EBS and CORP network Backout: Contact(s): George Nguyen 713-853-0691 Impact: CORP Time: Sat 9/15/2001 at 9:00:00 AM CT thru Sat 9/15/2001 at 1:00:00 PM CT Sat 9/15/2001 at 7:00:00 AM PT thru Sat 9/15/2001 at 11:00:00 AM PT Sat 9/15/2001 at 3:00:00 PM London thru Sat 9/15/2001 at 7:00:00 PM London Outage: Uplink Corrections Environments Impacted: ECN 4 Purpose: To connect network switches to standard Backout: If any switches do not come back online, I will connect them back to the original connection. Contact(s): Mark Trevino 713-345-9954 Impact: CORP Time: Fri 9/14/2001 at 6:00:00 PM CT thru Fri 9/14/2001 at 7:00:00 PM CT Fri 9/14/2001 at 4:00:00 PM PT thru Fri 9/14/2001 at 5:00:00 PM PT Sat 9/15/2001 at 12:00:00 AM London thru Sat 9/15/2001 at 1:00:00 AM London Outage: Hopix and Extpix Flash and IOS upgrade Environments Impacted: Corp Purpose: Need to bring IOS to standard level. image requires more flash memory Backout: Replace original flash card and set another day and time to upgrade Contact(s): Chris Trota 713-345-1697 FIELD SERVICES: No Scheduled Outages. INTERNET: No Scheduled Outages. LOTUS NOTES: SEE ORIGINAL REPORT MESSAGING: SEE ORIGINAL REPORT MARKET DATA: No Scheduled Outages. NT: No Scheduled Outages. OS/2: No Scheduled Outages. OTHER SYSTEMS: ALSO SEE ORIGINAL REPORT Impact: CORP Time: Fri 9/14/2001 at 5:00:00 PM CT thru Fri 9/14/2001 at 7:00:00 PM CT Fri 9/14/2001 at 3:00:00 PM PT thru Fri 9/14/2001 at 5:00:00 PM PT Fri 9/14/2001 at 11:00:00 PM London thru Sat 9/15/2001 at 1:00:00 AM London Outage: Move LMS Production DB instance Environments Impacted: All Purpose: HRGIM will be responsible for the Docent LMS application. Backout: Contact(s): Brandon Bangerter Raj Perubhatla 713-345-8016 281-788-9307 Brian Ellis 713-345-8017 713-446-6193 Mark Calkin 713-345-7831 Impact: EBS Time: Fri 9/14/2001 at 6:00:00 PM CT Fri 9/14/2001 at 4:00:00 PM PT Sat 9/15/2001 at 12:00:00 AM London Outage: Decommission Pleasanton, CA EBS Servers Environments Impacted: EBS Purpose: Office was sold and the servers are not required. Backout: Business critical data has been copied to Houston by Jeff Hughes and is already being backed up. Contact(s): Dan Dietrich 713-345-8836 SITARA: SEE ORIGINAL REPORT SUN/OSS SYSTEM: No Scheduled Outages. TELEPHONY: No Scheduled Outages TERMINAL SERVER: No Scheduled Outages. UNIFY: No Scheduled Outages. SCHEDULED SYSTEM OUTAGES: SA Impact: File Server (EIBRASAL1C01) Time: Sat 9/15/2001 at 5:00:00 AM CT thru Sat 9/15/2001 at 8:00:00 AM CT Sat 9/15/2001 at 3:00:00 AM PT thru Sat 9/15/2001 at 6:00:00 AM PT Sat 9/15/2001 at 7:00:00 AM Sao Paulo thru Sat 9/15/2001 at 10:00:00 AM Sao Paulo Sat 9/15/2001 at 11:00:00 AM London thru Sat 9/15/2001 at 2:00:00 PM London Outage: Electrical Maintenance Environments Impacted: ESA - Salvador Office Purpose: Electrical maintenance Backout: Contact(s): Paulo Barreto SCHEDULED SYSTEM OUTAGES: LONDON Impact: CORP Time: Fri 9/14/2001 at 6:00:00 PM CT thru Sat 9/15/2001 at 9:00:00 PM CT Fri 9/14/2001 at 4:00:00 PM PT thru Sat 9/15/2001 at 7:00:00 PM PT Sat 9/15/2001 at 12:00:00 AM London thru Sun 9/16/2001 at 3:00:00 AM London Outage: Complete Powerdown of the London office Environments Impacted: All Purpose: Installation of a third generator at Enron House Backout: Switch all equipment back on. Contact(s): Tracy Pearson 830-34238 London Tie Line ---------------------------------------------------------------------------------------------------------------------------- FOR ASSISTANCE (713) 853-1411 Enron Resolution Center Specific Help: Information Risk Management (713) 853-5536 SAP/ISC (713) 345-4727 Unify On-Call (713) 284-3757 [Pager] Sitara On-Call (713) 288-0101 [Pager] RUS/GOPS/GeoTools/APRS (713) 639-9726 [Pager] OSS/UA4/TARP (713) 285-3165 [Pager] CPR (713) 284-4175 [Pager] EDI Support (713) 327-3893 [Pager] EES Help Desk (713)853-9797 OR (888)853-9797 TDS -Trader Decision Support On-Call (713) 327-6032 [Pager]