22 Nov 2000, 09:43 UTC
Tetco M2
- From
- Michael H Garred michael.garred@enron.com
- Date
- Wed, 22 Nov 2000 01:43:00 -0800 (PST)
Chris,
I'm looking for gas delivered to two Tetco M2 interconnects with TCo.
At the minimum, I'm looking for an offer for a flat baseload volume for
December flow. My preference is to get an offer for a flat baseload volume
from December through March. The points and volumes are:
Delmont {Volume: 3,712/day}
Windrifge {Volume: 2,859/day}
Can I get a nymex plus offer?
Thanks.
mhg