13 Nov 2001, 20:20 UTC
Allegheny / NEPCO
- From
- Christopher F. Calger f..calger@enron.com
- Date
- Tue, 13 Nov 2001 12:20:39 -0800 (PST)
The "bid" is for an EPC Contract with the equipment. The implied bid for the equipment is -$16.7MM. The implied margin in the EPC Contract is $32MM plus $11MM of contingency. If the risk/reward on the EPC contract is reasonable, then this seems like a great deal. At the same time, we will attach a Turbine LOI to the EPC LOI making it clear to Allegheny that we can offer the turbines on a stand alone basis. Should we offer at the $10MM discount or are you OK with -$16.7MM? Ben and I would hit a -$16.7MM bid. This would probably close this in January, but we ould try to get a turbine down payment in December. Chris Calger 503-464-3735