Following please find a summary of the minor Y2K related glitches that various business units experienced following the rollover. As you can see, the problems we encountered were minimal indeed. Testing of less critical functions is ongoing and will continue through normal operations. Enron Europe ETOL - Power Station Optimizer application is not accepting data. The application is used for informational purposes only, and has no control functionality. Operations are not affected. ETOL will have the application repaired early next week. London - Enpower Europe deal selection criteria is not working with date criteria. The application does function with deal numbers, however. The Houston application team is currently working on the problem. London - Global Products Accounting has a minor data import problem. The problem does not impair daily operations. Repair date is set for January 4. Enron House - Fire detection system alarm lights do not turn off following tests. The problem is cosmetic only. Also, remote alarm systems skipped forward to the date January 31, 2000. It is believed the problem is also cosmetic only. EOTT Ticketing entry system had a minor problem which has already been repaired. General ledger application has a program that displays the year 1900. The extent of the issue and whether the problem is cosmetic only, is being pursued. International Regions Transredes, Columbia - The pipeline SCADA (Supervisory, Control, and Data Acquisition) system failed shortly after midnight. This means the pipeline control center is not automatically receiving pipeline information. The system is used for information purposes only and has not affected operations. Enron North America ENA - Enpower deal selection criteria is not working with date criteria. Same as item two of Enron Europe. ENA has already repaired the problem for North American operations. Currently discussing European implementation timeline. ENA - SIFT application has a Microsoft Import problem. This process is not critical to daily processes conducted by Global Products. Same issue as Enron Europe item three. Repair date is January 4. FacSys 4.1 passing wrong date, 01/01/100 instead of today,s date of 01/01/2000, to the fax machine which prints on the banner information. Remediation scheduled before January 4. Remediated three Excel macros in the non-commodity trading function.