Following please find a summary of the minor Y2K related glitches that 
various business units experienced following the rollover.  As you can see, 
the problems we encountered were minimal indeed.  Testing of less critical 
functions is ongoing and will continue through normal operations.


Enron Europe
ETOL - Power Station Optimizer application is not accepting data.  The 
application is used for informational purposes only, and has no control 
functionality.  Operations are not affected.  ETOL will have the application 
repaired early next week.

London - Enpower Europe deal selection criteria is not working with date 
criteria.  The application does function with deal numbers, however.  The 
Houston application team is currently working on the problem. 

London - Global Products Accounting has a minor data import problem.  The 
problem does not impair daily operations.  Repair date is set for January 4.

Enron House - Fire detection system alarm lights do not turn off following 
tests.  The problem is cosmetic only.  Also, remote alarm systems skipped 
forward to the date January 31, 2000.  It is believed the problem is also 
cosmetic only.

EOTT
Ticketing entry system had a minor problem which has already been repaired.

General ledger application has a program that displays the year 1900.  The 
extent of the issue and whether the problem is cosmetic only, is being 
pursued.

International Regions
Transredes, Columbia - The pipeline SCADA (Supervisory, Control, and Data 
Acquisition) system failed shortly after midnight.  This means the pipeline 
control center is not automatically receiving pipeline information.  The 
system is used for information purposes only and has not affected operations.

Enron North America 
ENA - Enpower deal selection criteria is not working with date criteria. Same 
as item two of Enron Europe. ENA has already repaired the problem for North 
American operations. Currently discussing European implementation timeline.

ENA - SIFT application has a Microsoft Import problem. This process is not 
critical to daily processes conducted by Global Products. Same issue as Enron 
Europe item three. Repair date is January 4.

FacSys 4.1 passing wrong date, 01/01/100 instead of today,s date of 
01/01/2000, to the fax machine which prints on the banner information. 
Remediation scheduled before January 4.

Remediated three Excel macros in the non-commodity trading function.