1 Dec 2000, 12:36 UTC
weekly report EHS
- From
- Michael Terraso michael.terraso@enron.com
- Bcc
- Maureen McVicker
- Date
- Fri, 1 Dec 2000 04:36:00 -0800 (PST)
ENA/EES-OEC New Jersey, Garden State Paper Mill ) Scott Watson scheduled to conduct Safety/Health Audit of this facility the week of December 11, 2000. Quality Management Plan (QMP) for Texas Bases RFP ) Assisting OEC in preparing an Environmental Compliance Plan for the Military Projects. Florida Power Plant Project ) Scott Watson provided Steve Rose (ENA) with EH&S information pertaining to Process Safety Management and Risk Management Plan Regulations. SPCC Plans for the Peaker Power Plants ) Ramiro Garcia worked with OEC management at the Brownsville, Gleason, and Wheatland Peakers on their SPCC Plans. He expects the plan for Wheatland to be completed by 11/30/00 and the plans for the other plants by 12/15/00. Due Diligence Support for the 1999 Peakers ) Gus Eghneim is supporting the effort to sell the 1999 Peaker plants by responding to written and verbal questions from potential buyers and Enron,s internal coordination team about environmental issues. 1999 Peaker Plants Refinancing ) Gus Eghneim is supporting the refinancing activities for the 1999 Peaker plants by responding to environmental questions prepared for this purpose. ACQUISITIONS Privatenel (Nicaragua) Power Plant Privatization - Don Stevens has learned that the advisors to the Privatization have recommended to put the calendar for the bid on hold until the courts in Nicaragua rule on the legality of the process. Project INGA (California and Pennsylvania Power Plant Acquisition) - Bill Keeney has informed that financial close is hoped to occur by the end of year (2000). Susan Worthen provided the "Final Environmental Summary" to George Schaefer, Frank Smith, Lou Stoler, Terry Donovan, Bill Williams, and Dave Duran. The summary addressed the issues of Section 114 response letters, Mt. Poso coal ash, impact of future regulations and ACE quarry issue. CWT Thermo-Depolymerization (EES New Technology) - Don Stevens has been informed by Gene O'Gorman that Enron has put a six month hold on the project. An environmental issues matrix is being prepared for the project. Massey (JV Coal Mine) - A possible site visit to review the environmental impacts from the Massey issue in Kentucky is being discussed. North Carolina CF Power Plants - Enron is attempting to acquire two coal fired (QF) power plants in North Carolina. Don Stevens contacted Dwight Beach to discuss the proposed acquisition. ENSR conducted the site due diligence, Dwight Beach will forward a copy to Don Stevens. PROJECTS EHS Web Site - The web site will be launched by December 1st. Gavin Dillingham and the Enron Networks Business Analyst, Tamika Hebert are populating the site with documents and databases. Telework/NEPI Program - Gavin Dillingham has been in contact with the National Environmental Policy Institute (NEPI) and has set up a meeting for December 14th to discuss the opportunities for Enron to earn emissions and tax credits by participating in a nation wide teleworking program. This program through NEPI may also be applied to Enron,s possible development of vanpools and Enron providing 100% subsidies for Metro bus riders. Patti Ucci of Enron Building Services will attend the meeting. Gavin has also contacted Larry Fenstad about the meeting but has not received a response. Lifecycle Process - Gavin Dillingham is filling in the spreadsheet for Enron, s lifecycle process. Much of the information for Enron Wholesale and Enron ETS/EOTT has been entered into the spreadsheet. Heather Mitchell from EES, has offered to help in providing numbers from EES. Greenhouse Gas Inventory - Gavin Dillingham has been working with Henry Van and his group to determine asset fuel types and fuel volumes for the Greenhouse Gas Inventory. He has received most of the data, but there has been some difficulty on getting the complete data from some of the assets. Asset Tracking Database - Gavin Dillingham has designed an asset tracking database for the EHS Compliance Group. The database will help in tracking the greenfield and brownfield projects that are currently being developed by Enron,s business/deal teams and the role that EHS is playing in these projects. REGULARORY -SAFETY/ ENVIRONMENTAL Enron Ergonomics Program Action Plan - Russell Tucker developed an Enron Ergonomics Program implementation plan to comply with the Grandfather exemption under the OSHA final rule on Ergonomics. This would avoid at some point having to implement the complex, prescriptive and resource intensive OSHA standard, reducing record keeping requirements, ability to shelter new facilities and acquired companies as Grandfathered and structure the Enron program in the most efficient manner taking advantage of existing risk management procedures. The plan was reviewed by the Enron Safety Subcouncil, the Wellness group and our contract occupational health physician. Final Enron Ergonomic Programs Issued - Russell Tucker issued to the members of the Enron EH&S Council the final drafts of the Enron Office and Plant/Field Ergonomic Program procedures updated to meet the requirements of the OSHA final rule for Grandfathering. Enron Ergonomics Program Legal Review - Russell Tucker and Frank Smith, Enron Corp Legal, selected outside legal council to review the proposed Enron Office and Plant/Field implementation plan and written programs against OSHA's final rule requirements for Grandfathering. With minor suggestions, the plan and written programs were found to be in keeping with the final rule for Grandfathering. Pennsylvania Coal Plants - Marc Phillips provided information about future regulations that could impact three coal plants in Pennsylvania. All three plants will be subject to the cap and trade program to reduce NOx emissions. Houston Non-attainment Regulations - Marc Phillips provided insight on the Houston non-attainment regulations to interested Enron personnel. The engine control limit will be 0.5 grams/hp-hr and the control dates will be delayed for two years. EcoElectrica Title V Air Permit - Marc Phillips has started his review of EcoElectrica's Title V draft operating permit. EUROPE, INDIA and ASIA Europe, Enron Metals ) Alan Stringer is working on the integration of Enron EHS Guidelines for Enron Metals. Alan developed a risk and liability management plan for the German Essen site to protect the warranties and indemnification in the leasehold contract. Scott Watson is scheduled to conduct an EH&S Audit of facility in Rancho Dominguez, CA December 4th & 5th, 2000. UK ETOL- Alan Stringer conducted an EHS audit on Nov. 28, '00. A report will be prepared next week. Spain, Arcos Plant ) Alan Stringer submitted comments on construction EHS plan from the owners perspective. Germany, Seines ) Alan Stringer reviewed documentation for contamination issues for parcel of land that Enron will take an option on. Philippines, Batangas Power Corporation and Subic Power Corporation Visit - Alan Stringer assisted in developing strategy on how to comply with the new regulations for installation of stack and ambient air continuous monitoring system as required by the 1999 Clean Air Act. Gus Eghneim is working with the plant managers to assess the impact of the regulations on the two sites and develop compliance strategies. CALME Panama, Bahia Las Minas and San Francisco Site - No additional soil removal is required. Samples from remediated soils met disposal requirements for local landfill. Impacted soil is being removed and new soil is being placed in excavated areas. Letter to ANAM is to be delivered indicating that we will stop Ambient Air Monitoring Program at the end of November, 2000. BLM has complied with contractual requirements of monitoring for 1 year. BLM has contracted with a local engineering firm to design secondary containment around large fuel storage tanks. ThermoRetec has provided a draft Remedial Investigation for the Colon site to Enron EHS in Houston and BLM in Panama. BLM has installed oil / water separators in discharge sumps of fuel storage tanks to eliminate discharge of bunker and diesel to storm water channel. Puerto Rico, San Juan Gas - D. Willmann and ThermoRetec met with James McMillan and Bill Middleton with EECC to discuss the coordination of environmental remediation work at San Juan Gas with the project for installing an LNG tank at San Juan Gas. There should be some significant cost savings by coordinating the two projects. We are waiting on laboratory analysis of impacted soils before developing final remediation plan. SOUTH AMERICA Bolivia, Bolivia-Brazil Pipeline Projects (GOB/GOMT) - Edgar Zuleta conducted an EHS audit of the project this week. Report will be prepared next week.