9 Sep 1999, 11:12 UTC
FJ Alliance
- From
- Kevin Hyatt kevin.hyatt@enron.com
- Bcc
- David A. Barr
- Date
- Thu, 9 Sep 1999 04:12:00 -0700 (PDT)
Look a paragraph 3.5 in the Alliance. It says once ECT submits an Energy Proposal, FJ has the option of (1) doing the project,, (2) consider a modified proposal, or (3) do nothing with the proposal. The point is, FJ does NOT have the option of doing the project on their own (which they chose to do on restructuring the Naheola energy island).