Enron email

Algorithmic Indexing

13 messages for with:will.smith@enron.com after:2001-09 before:2001-10

Newest Oldest

Matching messages by month
Skilling resigns
Q3 loss announced
Bankruptcy filing

with:will.smith@enron.com means Will Smith (will.smith@enron.com).

  1. 27 Sep 2001

    Duong Luu to Cara Semperger and 10 more

    Re: Testing the PSW

    Hello Cara, Please see comments showing below in RED BTW, if you need me to unroute all daily route & term route for June 22, i will be happy to do so. Thanks for taking …

  2. 25 Sep 2001

    Duong Luu to Corry Bentley, Cara Semperger, asem@enron.com and 3 more

    RE: Testing the PSW

    Thanks Cara & Corry, i will make sure every item get resolved dluu

  3. 25 Sep 2001

    Corry Bentley to Cara Semperger, asem@enron.com, David Poston and 4 more

    RE: Testing the PSW

    I ran the PSW for the East (6/22 data) and also had problems with each of the following: 1) Enter moves cell to the left 2) Colors changed 3) Path with transmission did n…

  4. 12 Sep 2001

    Will Smith to Corry Bentley, Asem Atta, Vishwanatha Venkataswami and 2 more

    RE:

    Corry, Asem is out today. I have Vish looking into it. Will

  5. 10 Sep 2001

    Asem Atta to Corry Bentley, Cara Semperger and 8 more

    Preschedule Workspace

    A new version of Preschedule Workspace has been migrated to Stage addressing the 'EDIT' bug of copying workspace. regards, Asem Atta x31700 Enron Net Works

  6. 10 Sep 2001

    Asem Atta to Corry Bentley, Will Smith and 6 more

    RE: PSW/PSC 0910 Test

    Corry, As per Will, the understanding was that deals with transmissions were far and few in between and were currently being manually routed, and this was not a feature t…

  7. 10 Sep 2001

    Corry Bentley to Will Smith and 4 more

    PSW/PSC 0910 Test

    Will, I found about the same issues we had already discussed while running the PSW/PSC. I ran the sheet for 6/19 since there were no "West" paths in the confirmations (I …

  8. 7 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley, David Poston and 4 more

    RE: Status Report and Production Release Note

    Just got done talking with Corry, and Deal Scheduling showing the incorrect status of a physical routed flag is an issue. Corry will proceed and test against pwrtestp on …

  9. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara, Thanks for stepping me through Deal Scheduling to see exactly what the problem was in regards to the Physical/Non-Physical issue. Addressed this issue and we have s…

  10. 6 Sep 2001

    Asem Atta to Cara Semperger, Corry Bentley and 8 more

    RE: Testing PSW and Path confirmation for Target date 6/20

    Cara et all, Following list of bug fixes are moving out to stage to address the recently reported issues: New versions of both applications have been moved out to stage..…

  11. 5 Sep 2001

    Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more

    Testing PSW and Path confirmation for Target date 6/20

    Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…

  12. 5 Sep 2001

    Asem Atta to Cara Semperger and 8 more

    RE: Testing the PSW and Path Confirm Report

    Cara, Could I get a copy of the psc file for the preschedworkspace tests you ran today? Id like to mimic your actions to see exactly how these errors were generated and p…

  13. 5 Sep 2001

    Cara Semperger to Asem Atta, Corry Bentley, David Poston and 8 more

    Testing the PSW and Path Confirm Report

    Good Morning/Afternoon/Evening; I started working in June 22 to test path cut capabilities. I was able to save a cut path. Please make sure that Bill Williams III and Who…