with:team.tescott@enron.com means team.tescott@enron.com.
-
22 Oct 2001
John Sturn to team.beaver-plant@enron.com, team.mullinville-maintenance@enron.com, team.mullinville-operations@enron.com and 53 more
Beaver to Bushton configuration without the Bushton turbine - REVISION
Well my plan lasted about 30 minutes. I had missed that Clifton unit 32 has been mothballed. It is in a preserved state, requiring an estimated 12 hours to place it back …
-
22 Oct 2001
John Sturn to team.beaver-plant@enron.com, team.mullinville-maintenance@enron.com, team.mullinville-operations@enron.com and 53 more
Beaver to Bushton configuration without the Bushton turbine
Below is a system configuration I was asked to put together to flow 1600 MM/D through Clifton without the Bushton turbine. A system weighted temperature of 29 F is foreca…
-
19 Oct 2001
Jodie Floyd to Frankie Adams, t..adams@enron.com, Jean Adams and 117 more
NNG Measurement Log thru 10/19/01
Attached is the NNG Measurement Log thru 10/19/01. I have created another sheet in the file named NNG Measlog sort by Region. Both sheet have the same information. Any qu…
-
19 Oct 2001
Jerry Graves to ken.anderson@enron.com, Ben Asante, scott.bade@enron.com and 36 more
Beatrice Region Outage Report Through May 2002
Please review the attached outage report. Jerry Graves 713-345-8923
-
12 Oct 2001
Jerry Graves to ken.anderson@enron.com, Ben Asante, scott.bade@enron.com and 36 more
Bushton ESD (Summary)
I wanted thank everyone involved in the Bushton ESD. Bushton Operations, for planning a smooth timely ESD. Ken Anderson, and John Sturn for finding a way keep some flows …
-
12 Oct 2001
Jodie Floyd to Frankie Adams, t..adams@enron.com, Jean Adams and 117 more
Measurement Log 10/11/01
Attached is the NNG Measurement Log thru 10/11/01. If you have comments please call me @ 713.853.7742. j. floyd