31 Dec 2001
Jerry Graves to David Roensch, Dennis Alters, Ron Matthews and 2 more
RE: Red Rock Outages
Sure Tiny, give me a call. Jerry
-
30 Dec 2001
David Roensch to Jerry Graves, Dennis Alters, Ron Matthews and 2 more
Red Rock Outages
I have a couple of questions Jerry, however I think they would be easier to discuss over the phone. I will be back in the office next week so maybe we can hook up.
-
20 Dec 2001
David Roensch to ben.tanner@enron.com, scott.hill@enron.com, Russ Ulibarri and 20 more
RE: preliminary report
Ben, we had discussions with Citizens this morning concerning the Griffith interconnect. Citizens has requested that we modify our controls so that we convert to a pressu…
-
17 Dec 2001
Susan Wadle to Kevin Hyatt, Dennis Alters, Larry Campbell and 10 more
RE: sun devil weekly meeting update
ECN 15C1 has been reserved each Monday (beginning 1/7/02) through the end of March for these meetings.
-
17 Dec 2001
Kevin Hyatt to Dennis Alters, Larry Campbell, Doug Cebryk and 11 more
sun devil weekly meeting update
Due to the holidays and vacation schedules, we will hold off having any further weekly project meetings until Monday, January 7 at 3:30pm. Plan on meeting in ECN 15c1. th…
-
14 Dec 2001
Jerry Graves to c..alexander@enron.com, Lynn Blair, mike.bonnstetter@enron.com and 72 more
Outage Commercial Review Schedule (2002)
FYI, Here is the 2002 schedule for the Outage Commercial Review Meeting. Note the new locations and the new conference code number. These dates have been set, but are sub…
-
13 Dec 2001
Jerry Graves to team.ashland@enron.com, team.beaver-mach-shop@enron.com, team.beaver-plant@enron.com and 170 more
Bushton Universe, Albuquerque, DesMoines, and Dakota Region Outage Reports Through December 2002
FYI, In the interest of sending fewer emails, I have attached Bushton Universe, Albuquerque, DesMoines, and Dakota Region outage reports to the same email. Please review …
-
13 Dec 2001
Ron Matthews to Darrell Schoolcraft
FW: Bloomfield La Plata Check Measurement pressure loss
FYI Ron Matthews
-
12 Dec 2001
Gary Choquette to Ben Asante, bob.mcchane@enron.com, John Sturn and 13 more
San Juan control modifications for fuel savings
I have spent a significant amount of time reviewing the operations and SCADA on the San Juan lateral over the last couple of weeks. I've uncovered some issues that could …
-
12 Dec 2001
Ron Matthews to Michelle Lokay, Darrell Schoolcraft, Kimberly Watson and 4 more
Burlington Study - El Paso WIndow Rock I/C
This is a revised spreadsheet from the one yesterday. Changes made were a result of discussions with Darrell. Still need to stick to our guns and NOT give Burlington any …
-
12 Dec 2001
Ben Asante to David Roensch, bob.mcchane@enron.com, Ron Matthews and 10 more
RE: FW: La Plata to Bloomfield
Thanks Rich, Tiny and the san Juan team. We appreciate your prompt response. ben
-
11 Dec 2001
Ron Matthews to Kimberly Watson, Michelle Lokay, Darrell Schoolcraft
El Paso/Burlington Window Rock Study Results
Attached is an Excel spreadsheet showing facilities and costs for 24" from Window Rock to Station #4 suction. Ron Matthews
-
6 Dec 2001
Jerry Graves to Jesse Alvarado, Roy Armitage, team.artesia@enron.com and 74 more
Albuquerque Region Outage Report Through December 2002
Please review the attached outage report. Jerry Graves 713-345-8923
-
5 Dec 2001
Maria Pavlou to Bill Rapp, Michelle Lokay, Darrell Schoolcraft and 23 more
Red Rock Contracts Impact on Next Rate Case
As a follow-up to our discussion when I was in Houston, attached is a memo that addresses how negotiated rate contracts will be treated in Transwestern's next rate case. …