with:robtaylor@akllp.com means Rob Taylor (robtaylor@akllp.com).
-
29 Nov 2000
Cheryl Lipshutz to Rob Taylor and 24 more
Re: GE Consent - Elektrobolt Turbines
The attachment looks innocuous enough to me. "Taylor, Rob" <robtaylor@akllp.com> 11/28/2000 07:46 PM To: <kay.mann@enron.com>, <roseann.engeldorf@enron.com>, <mary.cilia@…
-
29 Nov 2000
Lisa Bills to Sean Bunk and 12 more
Re: Transfer of GE Turbines Into Turbo Park
Sean, 1. On the signature lines for each document, please provide the role that each party is signing as. Also, Wilmington Trust is signing as Manager for E-Next Generati…
-
28 Nov 2000
Rob Taylor to Kay Mann, Roseann Engeldorf, Mary Cilia and 13 more
GE Consent - Elektrobolt Turbines
Attached is a draft of the GE consent to the assignment of the LM6000 Turbines to the Owner Trust. A draft of the Purchase Option Assignment and Assumption Agreement for …
-
28 Nov 2000
Sean Bunk to Lisa Bills, Catherine Clark, Kay Mann and 4 more
Transfer of GE Turbines Into Turbo Park
Attached are drafts of assignment documents to effect the transfer of the GE Turbines into the Turbo Park structure. Please feel free to call me at (713)220-4427 if you h…
-
28 Nov 2000
David Leboe to Catherine Clark and 12 more
Re: Austin Turbine Take-Out from West LB
No issues from an accounting structuring perspective. Since we are exercising the purchase option, I assume Enron is comfortable putting four turbines on the balance shee…
-
27 Nov 2000
Catherine Clark to Ben Jacoby, David Leboe and 10 more
Austin Turbine Take-Out from West LB
Re: Purchase Option Assignment and Assumption Agreement for Austin turbines I've added the equipment description in Schedule 1 and changed the date of the agreement to No…
-
27 Nov 2000
Rob Taylor to Sheila Tweed and 10 more
RE: GE Consent to Assignment
I did not think the One-Train Contract had been signed. If it has, we should include it. As I do not have a copy of either contract, I do not know the answer to your ques…
-
27 Nov 2000
Kay Mann to Rob Taylor, ppipitone@akllp.com, Peter J. Thompson and 3 more
Facility agreements for LM's/Agency arrangement
Do the LM facility agreements for DevCo turbines need to contemplate ENA as an agent? Will it specifically be ENA, or an ENA subsidiary? Thanks, Kay
-
26 Nov 2000
Roseann Engeldorf to Sheila Tweed and 10 more
Re: GE Consent to Assignment
Sheila - thanks for your v-mail - The last Lisa and I heard the "One Train" was not signed. That info. came by way of Ron Coker to Catherine Clark. Things may have change…
-
24 Nov 2000
Rob Taylor to kent.shoemaker@ps.ge.com, michael.barnas@ps.ge.com, stephen.swift@ps.ge.com and 6 more
GE Consent to Assignment
Attached is a draft of the Consent to Assignment and Agreement relating to the transfer of certain turbine contracts into the TurboPark structure. Please note that the at…
-
22 Nov 2000
Kay Mann to Rob Taylor and 16 more
Re: Purchase Option Assignment and Assumption Agreement (re Austin Project)
FYI, Kent Shoemaker (GE lawyer for LM's) is on vacation today, but I believe he will be back in the office next Monday. Kay
-
22 Nov 2000
Rob Taylor to Sheila Tweed, Kay Mann, Stuart Zisman and 6 more
Purchase Option Assignment and Assumption Agreement (re Austin Project)
Attached is a draft of the Purchase Option Assignment and Assumption Agreement relating to the 4 LM6000 turbines to be used in in the Austin, Texas Project. This document…