31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
We need know everyday units need to be taken down and for how long. Depending on system conditions we may have to allocate. DS From: Kenneth Young 05/31/2001 09:36 AM To:…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project Schedule - Stations 1-4
Ken, We currently have a unit down at Station 4. If you need to work on something now is the time to do it and not wait until June. DS From: Kenneth Young 05/30/2001 11:5…
-
31 May 2001
Darrell Schoolcraft to Kenneth Young and 38 more
Re: TW 1090 Project - Stations 1-4
What is the time frame these units need to be down. There are no postings for volume deductions. Please someone give me some ideas. Thanks Ds From: Kenneth Young 05/30/20…
-
24 May 2001
Darrell Schoolcraft to james.moore@enron.com and 26 more
Re: Concern - Possible Change In Smartpigging Dates
Right now it looks like we can run station 9, station 7, station 6 or station 5. We will just have to see what we have scheduled for the day. This will allow us to set ou…
-
24 May 2001
Darrell Schoolcraft to Arnie Bailey and 22 more
Re: Concern - Possible Change In Smartpigging Dates
You are correct looking at the models Ken Chow ran before he left was between 175 to 225 this will allow the pig to move approx. between 5 to 6 miles an hour. DS From: Ar…
-
24 May 2001
Darrell Schoolcraft to Max Brown and 22 more
Re: Concern - Possible Change In Smartpigging Dates
Is there a reason we think we will need to run station 8. I think with the volumes we will have to move to insure 6 miles and hour for the smart pig will be approx. 100 t…
-
18 May 2001
Larry Campbell to Lorraine Lindberg, Team Laguna, Team Mountainair and 4 more
RE: PCB sampling at Rio Puerco
Laguna and or Moutainair team, because I dont know which team is responsible for the Belen delivery point, would someone check on liquids at this location and if present,…
-
15 May 2001
Peter R. Stark to Max Brown, John Keller, Morgan Gottsponer and 13 more
RE: Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
Max, As an alternative to replacing pipe can we consider applying Armour Plate wrap? Peter. Eur Ing Peter R. Stark CEng BSc, BA, MSc, MIM, SenMWeldI, MIMarE. MICorr. Tel:…
-
11 May 2001
Larry Campbell to Lorraine Lindberg and 6 more
RE: PCB sampling at Rio Puerco
Lorraine, Ill give you a call this afternoon. By the way, did they test the liquids for PCBs? I havent heard from the Gallup team on whether they have gone and checked fo…
-
7 May 2001
Max Brown to John Keller, Morgan Gottsponer, Kevin Hyatt and 13 more
Rough Estimate of Costs For Possible TW MAOP Upgrade - 30" Mainline & Loop Lines Sta 5 to Colorado River
As I will be out of town at Gallup NM this week for the excavations planned for TW L-154 line, I will will miss the the meeting on the 10th. I have begun preparation of a…