with:perry.frazier@enron.com means Perry Frazier (perry.frazier@enron.com).
-
30 Mar 2001
Jeffery Fawcett to Cindy Bishop and 12 more
Realignment of New Contract
Cindy, Thank you for the quick turn around. You have a great weekend also!
-
27 Mar 2001
Eric Faucheaux to Steven Harris, Jo Williams, Kevin Hyatt and 23 more
P-2 Recycle & Cooling Issue
Upon further review of previous recommendations to install recycle and cooling at CS P-2 to provide greater turndown, it has been determined that the P-2 turbine has too …
-
13 Mar 2001
Perry Frazier to Michelle Lokay
Breakdown of Panhandle to Station #9 of 41.42 mmcfd.
This is what I have for the firm west on the Panhandle, 6/2002. Call with any questions. Plus .6
-
13 Mar 2001
Perry Frazier to Michelle Lokay and 6 more
P-2 Coolers and recycle line.
I understand this Level A is approved for work order generation. This is the cost from FP for a recyle line and coolers at P-2 to handle NNG Gray flows to Station # 9. Th…
-
13 Mar 2001
Michelle Lokay to Earl Chanley and 12 more
RE: Pogo Interconnect
After many conversations with John Havard at Pogo, it was decided that we will not continue with the Transwestern interconnect in the Pronghorn area. The drilling results…
-
13 Mar 2001
Michelle Lokay to Jeffery Fawcett and 2 more
RE: Contract terminations
The contracts that have either terminated or that had ROFR expire within the last 6 months are: Vastar #24926 for 4000/day, Burlington #25067 for 15000/day, Emerald #2456…
-
12 Mar 2001
Arnie Bailey to george.kneisley@enron.com and 22 more
Re: EOG Pronghorn
George, I guess I worded my questions wrong. No, We have nothing installed at this location. We're using a sampler now. Thanks, Arnie George Kneisley 03/11/2001 09:19 AM …
-
9 Mar 2001
Arnie Bailey to Earl Chanley and 20 more
EOG Pronghorn
Earl, Do you know where we stand on getting this equipment installed? Besides the GC, Del Mar, Water Monitor, there is still no power at the location. We also have no pos…
-
8 Mar 2001
Lorraine Lindberg to Perry Frazier and 18 more
RE: EPFS interconnect
I need as close to the exact cost for both 65,000 and 90,000 MMBtu/d as we can get. EPFS is going to pay for this and I don't want ETS to fund anything so it's important …
-
8 Mar 2001
Perry Frazier to Lorraine Lindberg and 18 more
RE: EPFS interconnect
Let me know if you need a level A or level B, in my book a level B is a "good to go" estimate. The prior scope of 60 MMBtu/d was the max. the tap could handle, any thing …
-
7 Mar 2001
Lorraine Lindberg to Perry Frazier, Arnie Bailey and 16 more
RE: EPFS interconnect
I just got off the phone with El Paso Field Services. At this time, I now need 2 cost estimates. One to increase the facilities to be able to handle up to 65,000 MMBtu/d …
-
6 Mar 2001
Mike McCracken to Kevin Hyatt, Michelle Lokay, Jeffery Fawcett and 34 more
Marketing Roundtable Notes
All Thank you very much for the great attendance and participation! Thanks, also, to all those who had to juggle this meeting with others. Attached are the notes from the…