30 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
COI rating change HE06-09 08/30/01
After the Day ahead market ran, the COI branch group TTC in the North to South and South to North direction was changed from 4300 MW to 4030 MW and from 3675 MW to 2450 M…
-
28 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Termination of Coordinated Operation of Controllable devices
System Notification: At 1632 PDT PAC Sent the following WSCCnet message: In accordance with WSCC Unscheduled Flow Reduction Procedure, this message is to advise you that …
-
28 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Coordinated Operation of Controllable devices
System Notification: At 1345 PDT, PAC sent the following WSCC Telenet message: Path 20 is experiencing high clockwise unscheduled flow. Net schedule on the Path has been …
-
27 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
Intra-Zonal Congestion
The ISO is experiencing increasing loading on the Pittsburg-Tassaraja 230kV line and requires additional decremental energy bids on the north side of the path and increme…
-
27 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
Incorrect Ex-post prices
Due to ISO computer problems the Hour Ending 0600 Ex-Post price for 08-27-2001 is not correct. The 10 minute interval prices for interval 5 and 6 are also incorrect. The …
-
26 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
OASIS Real time market information
Real time market information for HE 2400 08/25/01 and HE 0100 08/26/01 will be corrected within 96 hours. Sent by ISO Market Operations. The system conditions described i…
-
21 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
PDCI Re-rate for 8/21/01
Market Notification: After the Day-Ahead Market closed, PDCI TTC N-S was changed from 1757 to 2875 MW and S-N was changed from 1705 MW to 2804 MW starting HE02 for operat…
-
21 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
PDCI Derate for 8/21/01
Market Notification: After the Day-Ahead Market closed, PDCI TTC N-S was changed from 2525 to 1757 MW and S-N was changed from 1904 MW to 1705 MW starting HE01 for operat…
-
21 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Rating Changes to COI, PDCI, Path 15 and 26 for 8/21/01
Market Notification: After the Day Ahead Market ran for 8/21/01, the COI Branch Group (Path 66) limit was changed from 4030 to 4000 MW (N-S) and from 2450 to 3675 MW (S-N…
-
20 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
BEEP Normal (unsplit)
Internal path flows are now below limits. BEEP has been returned to normal mode (unsplit operation) as of 1700 hours. BEEP will dispatch as one zone. Sent by Market Opera…
-
20 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
Path 26
Path 26 N-S flows are near the limit. BEEP has been put into split region mode as of 1205 hours. BEEP will dispatch in two zones and will produce two Ex-Post prices. Sent…
-
20 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
COI, Path 15 & Path 26 de-rate extended
After the Day ahead market ran, the COI branch group TTC in the (N-S) direction was changed from 4030 MW to 4000 MW; and the Path 15 branch group TTC in the (N-S) directi…
-
17 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
HE15 Hour-Ahead Market - Re-Published
Market Notification: The HE15 Hour-Ahead Market for 8/17/01 has been republished. Inquires call (916) 351-4409. The system conditions described in this communication are …
-
17 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Re-rate to COI and NOB Branch Groups
Market Notification: After the Day Ahead Market ran for Friday, 8/17/01, for the operating day, 8/17/01, the COI Branch Group (Path 66) limit was changed from 4020 to 430…
-
16 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
USF Mitigation (Path 30)
1618 PDT WACM TERMINATES REQUEST FOR COORDINATED OPERATION OF CONTROLLABLE DEVICES FOR PATH 30 USF MITIGATION. Transfer Path: Path 30 (TOT 1A) Path transfer capability at…
-
15 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Disregard Path 15 and Victorville HA Branch Group Derates on OASIS
Market Notification: Please disregard the Hour-Ahead de-rate percentages that were published on OASIS today, 8/15/01, for both Path 15 and the Victorville Branch Groups. …
-
14 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Path 15 & Path 26 de-rate for 8/14/01
After the Day ahead market ran, the Path 15 branch group TTC in the (N-S) direction was changed from 1275 MW to 1000 MW and the Path 26 branch group TTC in both direction…
-
14 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
COI re-rate
After the Day ahead market ran, the COI branch group TTC in the (N-S) direction was changed from 4020 MW to 4300 MW and in the (S-N) direction was changed from 2450 MW to…
-
14 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
COI & PDCI de-rates
After the Day ahead market ran, the COI branch group TTC in the (N-S) direction was changed from 4300 MW to 4020 MW and in the (S-N) direction was changed from 3675 MW to…
-
10 Aug 2001
CAISO Market Operations - Realtime/BEEP to mktstathourahead@caiso.com
Path 15
Path 15 S-N flows are near the limit. BEEP has been put into split region mode as of 2313 hours. BEEP will dispatch in two zones and will produce two Ex-Post prices. Sent…
-
7 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
SI Server is Down
** URGENT NOTIFICATION: SI Servers UNAVAILABLE
-
6 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
SI Fall-Forward
** URGENT NOTIFICATION: SI Servers UNAVAILABLE, Tuesday, August 7th, 2001 (08:15 to 08:50pst) as we will be Falling-Forward to our Primary server in Folsom. Please submit…
-
2 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
Path Re-rates
After the Day ahead market ran, the branch group COI TTC in the N to S direction was changed from 4100 MW to 4300 MW and in the S to N direction from 2450 MW to 3675 MW a…
-
1 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
ISO Share (PNOB) South to North Derate
After the Day ahead market ran, the ISO Share (PNOB) branch group TTC in the (S-N) direction was changed from 1285 MW to 1264 MW for HE's 0100 through 1200 for operating …
-
1 Aug 2001
CAISO Market Operations - Hour Ahead to mktstathourahead@caiso.com
PDCI (TNOB) South to North Derate
After the Day ahead market ran, the PDCI (TNOB) branch group TTC in the (S-N) direction was changed from 1904 MW to 1873 MW for HE's 0100 through 1200 for operating day 8…