17 May 2001
ANNE FILAS to ISIDuff@aol.com@ENRON, darren_angerman@transcanada.com, sharon.baker@williams.com and 80 more
OFFER TO RELEASE CAPACITY
KeySpan Energy may be interested in releasing capacity for June, 2001 and June through September, 2001. READ THE ATTACHMENT FOR DETAILS ASSOCIATED WITH THIS OFFER. PLEASE…
-
11 May 2001
Terrence Kain to saulh@econnergy.com, vferreira@r-techenergy.com, pbaratz@totalnrg.com and 64 more
May 16th Meeting on Capacity
At or before the May 16th meeting in Hicksville, there is some basic information that is needed for marketers to determine their regulatory risk in accepting capacity fro…
-
10 May 2001
Melanie Hunter to jadams2@enron.com, gascontroller@aec.ca, carol_airey@altagas.ca and 260 more
PG&E Gas Transmission-NW Kingsgate Capacity Limitation
Due to system high pressure and inventory balancing, PG&E Gas Transmission-Northwest is limiting the Kingsgate capacity to 2335 MMcf/d effective Gas Day Thursday, May 10,…
-
9 May 2001
Melanie Hunter to abshirek@epenergy.com, jadams2@enron.com, gascontroller@aec.ca and 261 more
PG&E GTN Unscheduled Station 14 Maintenance
PG&E Gas Transmission-Northwest will be performing unscheduled maintenance at Station 14 on Friday, May 11, to replace a dry seal on the Station 14 A-unit. The maintenanc…
-
4 May 2001
Patrick P. Rubertone to Michael A Bauer" @ENRON and 152 more
Re: Winter Capacity
Please be advised that the location of the meeting has been changed to the KeySpan Energy Delivery Hicksville Office. Please see attached for directions. Thanks, Pat Rube…
-
3 May 2001
Michael A Bauer to rlukas@keyspanenergy.com, saulh@econnergy.com, vferreira@r-techenergy.com and 83 more
Winter Capacity
KeySpan Energy Delivery of New York and Long Island will be conducting a meeting in our Metrotech Brooklyn offices on Wednesday, May 16th to discuss our proposed winter c…
-
2 May 2001
Melanie Hunter to Derek Aberle, abshirek@epenergy.com, jadams2@enron.com and 261 more
PG&E GTN Station 3 Maintenance Update
The Station 3 maintenance will continue for gas day Thursday, May 3rd. Therefore, the Kingsgate receipt capacity will remain limited to 2280 MMcf/d until further notice. …